Independence Greenway
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Peabody · Essex County
Conditions now
Loading the weather near Peabody…
Forecast by the National Weather Service for Peabody · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Russel Street Trailhead mile 0 directions to Russel Street Trailhead
- Russell Street Crossing Trailhead mile 1.8 directions to Russell Street Crossing Trailhead
- Parking at Russell Street mile 2.1 directions to trailhead 3
- Lowell Street Crossing Trailhead mile 2.2 directions to Lowell Street Crossing Trailhead
- Lt. Ross Trailhead mile 2.8 directions to Lt. Ross Trailhead
- Peabody Road Trailhead mile 3.6 directions to Peabody Road Trailhead
- Parking at Nancy Avenue mile 4 directions to trailhead 7
- Essex Center Drive Trailhead mile 5.3 directions to Essex Center Drive Trailhead
(opens in a new tab) About this trail
The Independence Greenway is a paved multi-use path in Peabody, Massachusetts. The City of Peabody describes it as a 4.6-mile path in two segments and the largest greenway in the city, and says it connects with the Border to Boston Trail, a 70-mile shared-use trail from the New Hampshire border to Boston, and with the East Coast Greenway. This record maps the two segments as about 2.9 and 1.7 miles.
The greenway follows part of the former Salem and Lowell Railroad, which ran its inaugural trains on August 1, 1850. The eastern end of the line, from Peabody to West Peabody, was abandoned in 1962; the remaining track to South Middleton, which reached a Boston and Maine line in South Peabody, saw its final train in 1980 and was formally abandoned in 1987. The section in Lynnfield and Peabody was later converted to the Independence Greenway.
The 2.9-mile West Peabody segment runs from Lt. Ross Park to Russell Street at the Peabody–Middleton line, past the Norris Brook watershed, the Crystal Lake Conservation Area, the Hoover Street wetlands and the Ipswich River watershed. The 1.7-mile eastern segment runs from Peabody Road to the Lahey Clinic parking lot at the North Shore Mall off Essex Center Drive, parallel to much of Lowell Street, with a nature trail to Jacobs Cemetery. Route 1 and Interstate 95 separate the two. The city is designing two extensions: a 1.2-mile Route 1 pedestrian and bicycle bridge and Lowell Street connector, and a 1.4-mile extension from the North Shore Mall under Route 128 to the Endicott Street bridge. In February 2024 the Route 128 extension was scheduled to begin construction that summer, and the connector, which would add a crosswalk to the Danvers Rail Trail, in early 2026.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Middleton, 5.7 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 44 56 67 75 81 80 73 62 50 40 Low °F 16 17 25 35 45 55 60 59 52 40 31 23 Precipitation, in 3.5 3.3 4.5 4.3 3.7 4.2 3.8 3.3 3.8 4.8 4 4.8 Snow, in 13.4 13.2 9.4 1.8 0 0 0 0 0 0 1.1 8.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Salem sheet (1:62,500); the 1956 Salem sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesGreenway Projects — City of Peabody
Nearby trails
- Kristen Crowley Trail 0.4 mi away · 0.9 mi, gravel
- Danvers Rail Trail 1.0 mi away · 4.3 mi, crushed stone
- Middleton Rail Trail 2.0 mi away · 4.5 mi, gravel
- Border to Boston Trail 2.4 mi away · 7.0 mi, crushed stone
- Mayor Anthony Salvo Bike Path 2.9 mi away · 1.7 mi, paved
- Wakefield Lynnfield Rail Trail 4.0 mi away · 0.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9710649, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway Projects — City of Peabody, MA · government source · checked Oct 13, 2026 Supports: 4.6-mile paved multi-use path in two segments, largest greenway in Peabody, Border to Boston Trail and East Coast Greenway connections, 2.9-mile West Peabody segment from Lt. Ross Park to Russell Street and the places it passes, 1.7-mile segment from Peabody Road to the Lahey Clinic lot at the North Shore Mall, Lowell Street, Jacobs Cemetery nature trail, the two extensions in design
- Salem and Lowell Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: inaugural trains August 1, 1850, Peabody–West Peabody abandonment 1962, final train to South Middleton 1980, formal abandonment 1987, Lynnfield and Peabody section converted to the Independence Greenway
- MassDOT Plans to Bridge a Major Barrier in Border to Boston Trail Network — StreetsblogMASS · press · checked Oct 13, 2026 Supports: segments separated by Route 1 and I-95, Route 128 extension scheduled to start construction summer 2024, I-95 connector construction planned for early 2026, crosswalk link to the Danvers Rail Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
