States › Massachusetts

Middleton Rail Trail

Rail-trail in Massachusetts

Runs through Middleton and Danvers · Essex County

Conditions now

Loading the weather near Danvers…

Forecast by the National Weather Service for Danvers · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.5 mi 7.3 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Central Street mile 2.6 directions to trailhead 1
  2. S-Lot mile 4.7 directions to S-Lot
Middleton Rail Trail, Middleton MA.jpg (opens in a new tab)
Middleton Rail Trail, Middleton MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Middleton Rail Trail is a stone dust rail trail being built across Middleton, Massachusetts, on the former Essex Railroad between the North Andover line and Danvers. The Essex Railroad, chartered in 1846, was completed from Salem to the Boston and Maine main line in North Andover by September 1848 and from 1851 was run by the Eastern Railroad as its Lawrence Branch. It passed to the Boston and Maine with the Eastern in 1884, and in 1927 the section between Stevens Station in North Andover and Danvers Junction was abandoned.

The nonprofit Middleton Rail Trail Alliance (MiRTA), founded in 2018, is developing the trail; the town has its own Rails to Trails Committee. The Middleton Electric Light Department holds the leased rights to the railbed from the Danvers line north to Essex Street, runs its power lines along it and may close sections for line work. The first phase, between Creedon Lane and Essex Street, was finished in 2020, Central Street to Oak Street in 2021, and Perkins Road to the Danvers line in 2022, giving 2.2 miles of continuous trail between Essex Street and Danvers apart from a sidewalk crossing of the Ipswich River on Maple Street.

MiRTA gives the full route as about 4.5 miles, from Sharpner's Pond Road at the North Andover line to Hathorne in west Danvers; the mapped trail is about 4.9 miles. West of Essex Street the railbed is unimproved and signed as the Essex Railway Trail, with boulders, narrow footbridges over Boston Brook, a gate and a rock cut, and a short stretch on Old Essex Street. At the eastern end, Danvers has added a 0.8-mile section from the Middleton line to Access Road and is building a 2.9-mile extension northwest from Wayne Marquis Memorial Park to connect with the Middleton trail.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

66% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Middleton, 0.6 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353844566775818073625040
Low °F161725354555605952403123
Precipitation, in3.53.34.54.33.74.23.83.33.84.844.8
Snow, in13.413.29.41.80000001.18.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Lawrence sheet (1:62,500); the 1951 Reading sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rail Trail — Town of Danvers · government source · checked Oct 13, 2026
    Supports: 2.9-mile extension from Wayne Marquis Memorial Park northwest to the Middleton Rail Trail, sections open
  3. Middleton Rail Trail Alliance (MiRTA) · organization · checked Oct 13, 2026
    Supports: MiRTA founded 2018, 4.5-mile stretch of the Essex Railroad from Danvers to North Andover, Phase 3 Perkins Road to the Danvers line complete, 2.2 miles continuous between Essex Street and the Danvers line except the Ipswich River sidewalk crossing, Danvers 0.8-mile section from Access Road to the Middleton line, town Rails to Trails Committee
  4. Middleton Rail Trail History & Key Milestones — MiRTA · organization · checked Oct 13, 2026
    Supports: phase 1 Creedon Lane–Essex Street 2020, Central Street–Oak Street 2021, Perkins Road–Danvers line 2022
  5. Middleton Rail Trail Easements & Ownership — MiRTA · organization · checked Oct 13, 2026
    Supports: Middleton Electric Light Department leased rights from the Danvers line to Essex Street, electric circuits on the railbed, closures for line work
  6. Trail Description — MiRTA · organization · checked Oct 13, 2026
    Supports: Sharpner's Pond Road at the North Andover line to Hathorne, about 4.5 miles, Essex Railway Trail sign, boulders, footbridges over Boston Brook, gate, Old Essex Street, rock cut through granite ledge, sidewalk on Maple Street over the Ipswich River
  7. Essex Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: charter 1846, completed to North Andover by September 1848, Eastern lease and Lawrence Branch from October 1851, Boston and Maine 1884, 1927 abandonment between Stevens Station and Danvers Junction
  8. Middleton Rail Trails, MA — Trailspotting (April 2023) · web · checked Oct 13, 2026
    Supports: crushed stone surface, unimproved Essex Railway Trail section west of Essex Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.