Indian Creek Pathway
Greenway in Idaho
Runs through Nampa and Kuna · Canyon and Ada counties
Conditions now
Loading the weather near Nampa…
Forecast by the National Weather Service for Nampa · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Swan Falls Road directions to trailhead 1
- Parking at West 2nd Street directions to trailhead 2
(opens in a new tab) About this trail
The Indian Creek Pathway, also called the Indian Creek Trail, is a paved multi-use path along Indian Creek in Nampa, Idaho. A 2020 pre-concept report that Kittelson & Associates prepared for the Community Planning Association of Southwest Idaho (COMPASS) and the City of Nampa describes an asphalt path 8 to 10 feet (2.4 to 3 m) wide that runs from East Amity Avenue near Mihan Lane to East Shortline Drive near East White Oak Court, generally following the creek, with enhanced crossings at South Kings Road and South Sugar Avenue. The report gives its length as 1.5 miles (2.4 km), and the Nampa piece mapped here covers about 1.4 miles (2.3 km). It describes the creek as a greenbelt between the residential neighborhoods to the north and the commercial and industrial activity along East Railroad Street to the south.
The same report records the city's proposal to extend the path north from its end near East Shortline Drive toward 16th Avenue North, passing under elevated Union Pacific and Boise Valley Railroad Company rail lines. The proposal builds on the North Nampa Indian Creek Trail Master Plan, which the U.S. Army Corps of Engineers completed in August 2009. As of the report's August 2020 date the extension was a proposal.
The record also carries a separate piece of about 1.4 miles (2.3 km) in Kuna that OpenStreetMap names Indian Creek Pathway too, tagged asphalt and designated for bicycles and pedestrians. A park beside it is named Greenbelt Park in OpenStreetMap. In 2019 the Kuna Melba News described Kuna's Greenbelt as about 1.1 miles (1.8 km) long, reaching Orchard Street.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Nampa Sugar Factory, 5.9 km from the trail's middle, 8 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 47 57 64 74 83 93 92 81 67 51 40 Low °F 23 26 32 36 44 51 57 56 46 36 28 23 Precipitation, in 1.4 1 1.3 1.1 1.4 0.7 0.3 0.2 0.4 0.8 1.2 1.4 Snow, in 3.4 1.4 0.2 0 0 0 0 0 0 0 0.5 4.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1898 Nampa sheet (1:125,000); the 1958 Nampa sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Stoddard Pathway 0.3 mi away · 3.1 mi, paved
- Wilson Trail 2.0 mi away · 3.7 mi, paved
- Grimes Pathway 2.3 mi away · 1.6 mi, paved
- Edwards Pathway 2.8 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Indian Creek Pathway, 16th Avenue N to East Shortline Drive: Final Pre-Concept Report — COMPASS (Kittelson & Associates, August 9, 2020) · organization · checked Oct 31, 2026 Supports: existing path also known as Indian Creek Trail; asphalt, 8 to 10 feet wide; East Amity Avenue near Mihan Lane to East Shortline Drive near East White Oak Court; enhanced crossings at South Kings Road and South Sugar Avenue; paved 1.5-mile path; creek as a greenbelt between neighborhoods and the East Railroad Street corridor; proposed extension north toward 16th Avenue N under Union Pacific and BVRC rail lines; master plan by the Army Corps of Engineers completed August 2009
- City to dedicate Greenbelt to former Kuna Mayor Greg Nelson May 31 — Idaho Press (Kuna Melba News, May 15, 2019) · press · checked Oct 31, 2026 Supports: Kuna's Greenbelt about 1.1 miles long, extending to Orchard Street
- Indian Creek Pathway — OpenStreetMap way 696511170 · web · checked Oct 31, 2026 Supports: the Nampa piece: asphalt, designated for bicycles and pedestrians
- Indian Creek Pathway — OpenStreetMap way 354323125 · web · checked Oct 31, 2026 Supports: the Kuna piece: asphalt, designated for bicycles and pedestrians
- Greenbelt Park — OpenStreetMap way 520427567 · web · checked Oct 31, 2026 Supports: a park named Greenbelt Park, beside the Kuna piece
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.