Stoddard Pathway
Rail-trail in Idaho
Runs through Nampa · Canyon County
Conditions now
Loading the weather near Nampa…
Forecast by the National Weather Service for Nampa · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Murray Street mile 0.5 directions to trailhead 1
- Parking at East Greenhurst Road mile 1.6 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Stoddard Pathway is a paved path of about 3.1 miles in Nampa, Idaho, built on a former rail corridor. The City of Nampa Parks and Recreation Department maintains it, and it closes from sunset to sunrise. Dogs must be leashed.
It begins at the Ridenbaugh Canal and runs north, connecting to several subdivisions, Maple Wood Park and the Partridge Pathway Trail. Along the way it crosses Locust Lane, Greenhurst Road, Iowa Avenue, Amity Avenue and Sherman Avenue. As of 2018, the north end was still unpaved and ended at Sherman Avenue; the OpenStreetMap record maps the whole length as paved, so the paved length may have grown since.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 41% of this route as a trail on former railroad right-of-way.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Nampa Sugar Factory, 6.8 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 47 57 64 74 83 93 92 81 67 51 40 Low °F 23 26 32 36 44 51 57 56 46 36 28 23 Precipitation, in 1.4 1 1.3 1.1 1.4 0.7 0.3 0.2 0.4 0.8 1.2 1.4 Snow, in 3.4 1.4 0.2 0 0 0 0 0 0 0 0.5 4.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1898 Nampa sheet (1:125,000); the 1958 Nampa sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Indian Creek Pathway 0.3 mi away · 2.9 mi, paved
- Wilson Trail 0.8 mi away · 3.7 mi, paved
- Edwards Pathway 2.3 mi away · 1.4 mi, paved
- Grimes Pathway 2.7 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Stoddard Pathway - Hiking Project · web · checked Oct 17, 2026 Supports: Nampa Parks and Recreation maintenance, sunset to sunrise closure, rail-to-trail, Ridenbaugh Canal start, connections, cross streets, 2018 unpaved north end
- OpenStreetMap · web · checked Oct 17, 2026 Supports: mapped length, paved surface and rail corridor of this record
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.