Jackson Creek Trail
Greenway in Indiana · OpenStreetMap relation
Runs through Bloomington · Monroe County
Conditions now
Loading the weather near Bloomington…
Forecast by the National Weather Service for Bloomington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Elliston Drive mile 0.6 · water directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Jackson Creek Trail is a paved trail of about 1.3 miles in southeast Bloomington, Monroe County, Indiana, along Jackson Creek. OpenStreetMap maps it as a signed local bicycle route with the reference JCT, in asphalt, with a trailhead at East Elliston Drive near Sherwood Oaks Park.
The City of Bloomington's Engineering Department built the trail in phases. Its Jackson Creek Trail Master Plan of 2013 identified the corridor; Phase II, designed from 2018 to 2019 and built from 2021 to 2022, added about 1.5 miles of two-way bicycle and pedestrian facilities separated from the roadway, and the city reported construction substantially complete on March 2, 2026, while Duke Energy relocated poles and guy wires. Phase II connects to Phase 1, Jackson Creek Middle School, Sherwood Oaks Park, Childs Elementary School, South East Park and the Goat Farm park.
The southern section starts at the Sare Road and Rhorer Road intersection, runs west along Rhorer Road, crosses Jackson Creek on a pedestrian bridge and runs north along the creek to the existing trail at Southern Oaks Park. The northern section starts at the High, Winslow and Rogers roundabout and follows High Street to Arden Drive, then Arden Drive east to South East Park.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bloomington Indiana Univ, 5 km from the trail's middle, 42 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 42 52 64 74 82 85 84 78 66 53 41 Low °F 21 23 32 42 53 62 65 64 56 44 34 26 Precipitation, in 3.8 3 3.7 5.2 5.4 5.4 4.6 3.4 3.8 3.8 3.9 3.5 Snow, in 7.1 4.2 1.3 0.1 0 0 0 0 0 0.1 0.2 4.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1908 Bloomington sheet (1:48,000); the 1956 Bloomington sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Bloomington Rail Trail 1.2 mi away · 2.1 mi, paved
- B-Line Trail 1.2 mi away · 3.1 mi, paved
- Clear Creek Trail 1.8 mi away · 2.4 mi, paved
- Limestone Greenway 2.0 mi away · 1.7 mi, paved
- Cascades Park Trail 4.2 mi away · 2.1 mi, paved
- Karst Farm Greenway 4.5 mi away · 7.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19246219, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Jackson Creek Trail Phase II - City of Bloomington Engineering · government source · checked Oct 18, 2026 Supports: phases, dates, endpoints, connections, 2013 master plan, status
- Jackson Creek Trail - OpenStreetMap relation 19246219 · web · checked Oct 18, 2026 Supports: asphalt surface, JCT reference, East Elliston Drive location
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.