States › Indiana

Limestone Greenway

Greenway in Indiana

In Monroe County

Conditions now

Loading the weather near Smithville-Sanders…

Forecast by the National Weather Service for Smithville-Sanders · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Limestone Greenway is a multi-use trail in Monroe County, Indiana. It begins south of Church Lane, directly connecting to the Clear Creek Trail, and ends close by to Victor Pike, on land used as mitigation for the construction of I-69.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Monroe County - Dillman Road crossing Clear Creek - P1120743 (opens in a new tab)
Monroe County - Dillman Road crossing Clear Creek - P1120743 · Photo: User:Vmenkov · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Limestone Greenway is a paved trail of about 1.7 miles south of Bloomington in Monroe County, Indiana, built and run by Monroe County Parks and Recreation. It follows a former Illinois Central Railway corridor that the county acquired in a land swap with the City of Bloomington, according to Wikipedia. Earlier plans for a trail on the corridor were dropped in 1996 after neighboring landowners sued.

The county says it runs south from the City of Bloomington's Church Lane trailhead to the Mitigation Property on South Victor Pike, land the county acquired as part of the Interstate 69 construction. At its northern end it connects to the Clear Creek Trail. Wikipedia gives the length as 1.8 miles and the surface as asphalt.

The county reports it was completed in summer 2019, as the county's newest trail, with a 2017 Recreational Trails Program grant from the Indiana Department of Natural Resources. Wikipedia lists the cost as $1,030,554.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

68% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bloomington Monroe County Airport, 6.8 km from the trail's middle, 57 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394354667482858478675342
Low °F222533435362646255443427
Precipitation, in3.42.73.84.94.55.14.93.33.63.73.73.3
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Bloomington sheet (1:48,000); the 1956 Clear Creek sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Limestone Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q136706783, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Limestone Greenway - Monroe County Parks and Recreation, Indiana · government source · checked Oct 18, 2026
    Supports: 1.7 miles, endpoints, paved, completed summer 2019, grant, I-69 mitigation property
  5. Limestone Greenway - Wikipedia · organization · checked Oct 18, 2026
    Supports: Illinois Central corridor, land swap, 1996 lawsuit, 1.8 miles, asphalt, Clear Creek connection, cost

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.