States › Massachusetts

Jay McLaren Memorial Trail

Rail-trail in Massachusetts

Runs through Merrimac · Essex County

Conditions now

Loading the weather near Amesbury…

Forecast by the National Weather Service for Amesbury · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Bridge, Jay McLaren Memorial Trail, Merrimac MA.jpg (opens in a new tab)
Bridge, Jay McLaren Memorial Trail, Merrimac MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Jay McLaren Memorial Trail, also called the McLaren Trail, is an unpaved rail trail of about 2 miles in Merrimac, Massachusetts, running north from near the town center to the New Hampshire line. The town's Open Space Committee describes it as a recreational trail of 45 acres and publishes its map.

The trail follows the West Amesbury Branch Railroad, which opened in 1873 between Newton Junction, New Hampshire, and Merrimac and was leased almost at once by the Boston and Maine Railroad. Passenger service ended in 1927, and freight continued until the line was abandoned in 1972. In New Hampshire the railbed is the Peanut Trail; a closed section on private land in between keeps the two trails from connecting.

The trail begins behind the Church Street Cemetery, with parking at 61 Church Street near Abbott Street. It follows Cobbler Brook north past the Perkins Conservation Area, then crosses a large wetland and farm fields in the Back River and Cobbler Brook watersheds. At its northern end the Marshview Trail branches off through woods and fields and along a wetland, linking by the Innis Trail to Brush Hill Road; the rail trail itself ends at the state line north of Brush Hill Road. The surface is mostly hard-packed dirt, with grass and gravel. Walking, bicycling, horseback riding and cross-country skiing are allowed; motorized vehicles are not, and pets must be leashed.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 70% of this route as a trail on former railroad right-of-way.

Shade

82% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Haverhill, 10.6 km from the trail's middle, 29 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353845576876828174625040
Low °F161724344554615951403122
Precipitation, in3.53.64.84.34.14.23.53.845.33.94.5
Snow, in16.215.611.91.8000000.11.410.8
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Haverhill sheet (1:62,500); the 1955 Haverhill sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Marshview & McLaren Trails (map, updated June 2024) — Merrimac Open Space Committee, Town of Merrimac · government source · checked Oct 13, 2026
    Supports: two-mile trail of 45 acres, begins near the town center along Cobbler Brook, Perkins Conservation Area, wetland and farm fields in the Back River and Cobbler Brook watersheds, Marshview Trail and Innis Trail to Brush Hill Road, walking, biking and horseback riding, no motorized vehicles, pets leashed
  3. Open Space Committee — Town of Merrimac, MA · government source · checked Oct 13, 2026
    Supports: the committee's trail maps and McLaren Trail access points on Church Street and Brush Hill Road
  4. West Amesbury Branch Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: route Newton Junction to Merrimac, opened 1873, leased by the Boston and Maine, passenger service ended 1927, abandoned 1972, Peanut Trail in NH, closed private section between the trails
  5. Jay McLaren Memorial Trail — TrailLink · web · checked Oct 13, 2026
    Supports: endpoints at the Church Street Cemetery and the NH state line north of Brush Hill Road, dirt, grass and gravel surface, cross-country skiing, parking at 61 Church Street near Abbott Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.