States › New Hampshire

Peanut Trail

Rail-trail in New Hampshire

Runs through Newton · Rockingham County

Conditions now

Loading the weather near Amesbury…

Forecast by the National Weather Service for Amesbury · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.2 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Peanut Trail 1, Newton NH.jpg (opens in a new tab)
Peanut Trail 1, Newton NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Peanut Trail is a rail trail of about 1.4 miles in Newton, New Hampshire, on the New Hampshire part of the former West Amesbury Branch Railroad. The branch ran between Newton Junction, New Hampshire, and Merrimac, Massachusetts. It opened in 1873 and was immediately leased by the connecting Boston and Maine Railroad; passenger service ended in 1927, and freight service continued until the line was abandoned in 1972.

The Massachusetts part of the railbed is the Jay McLaren Rail Trail in Merrimac. The two trails do not connect: a closed section between them lies on private land, and riders link them by road. The Peanut Trail's west end meets Whittier Street, and its main trailhead is on South Main Street; east of South Main Street the old bed continues, unmarked and rougher, on land owned by the town.

The surface is hardpack with occasional small rocks, and the route is almost flat; TrailLink lists it as cinder. Motor vehicles are not allowed, and the trail is used for bicycling, walking and running. Parking is a roadside pull-off across from 22 Whittier Street, with room for a couple of vehicles, and another access is on Main Street near the fire station. A trail runner reported in 2018 that the first mile from Whittier Street was well maintained and the last half mile, by the stables, was not.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.

West Amesbury Branch and Peanut Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

79% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Haverhill, 12.1 km from the trail's middle, 44 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353845576876828174625040
Low °F161724344554615951403122
Precipitation, in3.53.64.84.34.14.23.53.845.33.94.5
Snow, in16.215.611.91.8000000.11.410.8
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Haverhill sheet (1:62,500); the 1955 Haverhill sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Amesbury Branch Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: branch from Newton Junction to Merrimac, opened 1873 and leased by the Boston and Maine, passenger service ended 1927, abandoned 1972, Peanut Trail on the New Hampshire section, Massachusetts section a rail trail, closed section on private land between them
  3. Peanut & Jay McLaren Rail Trails, NH-MA — Trailspotting · web · checked Oct 13, 2026
    Supports: 1.4-mile length, hardpack surface with occasional small rocks, almost flat, west end at Whittier Street, main trailhead on South Main Street, rougher unmarked town-owned land east of South Main Street, road link to the Jay McLaren Rail Trail, roadside parking for a couple of vehicles
  4. Peanut Trail — TrailLink · web · checked Oct 13, 2026
    Supports: cinder surface, no motor vehicles, biking, walking and running, pull-off across from 22 Whittier Street, access on Main Street near the fire station, 2018 review on maintenance

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.