States › Pennsylvania

Martin Luther King Junior Drive Trail

Greenway in Pennsylvania · OpenStreetMap relation

Runs through Philadelphia · Philadelphia County

Conditions now

Loading the weather near Philadelphia…

Forecast by the National Weather Service for Philadelphia · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.3 mi 7.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Martin Luther King Junior Drive mile 1.9 directions to trailhead 1
  2. Parking at Martin Luther King Junior Drive mile 2.5 directions to trailhead 2
  3. Parking at Martin Luther King Junior Drive mile 2.8 directions to trailhead 3
  4. Parking at Martin Luther King Junior Drive mile 3.5 directions to trailhead 4
  5. Parking at Martin Luther King Junior Drive mile 3.6 directions to trailhead 5

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Schuylkill River Viaduct: EAST EMBANKMENT AND FIRST ARCH, FROM SOUTH--LEVEL Copy photograph of photogrammetric plate LC-HAER-GS05-B-1971-301L (opens in a new tab)
Schuylkill River Viaduct: EAST EMBANKMENT AND FIRST ARCH, FROM SOUTH--LEVEL Copy photograph of photogrammetric plate LC-HAER-GS05-B-1971-301L · Photo: HAER PA-39 · No known restrictions · Library of Congress, Prints & Photographs Division

About this trail

The MLK Drive Trail is a Philadelphia Parks & Recreation trail along Martin Luther King Jr. Drive, formerly West River Drive, on the west bank of the Schuylkill River in Philadelphia. It runs about four miles from the Falls Bridge in East Falls downriver toward Eakins Oval, and riders reach it from the Schuylkill Banks and the Schuylkill River Trail along Kelly Drive on the opposite bank. It is a park greenway along a riverside drive, not a rail-trail.

The drive itself has been closed to motor vehicles on weekends seasonally since 1995, in a program run by the Department of Streets, Philadelphia Parks & Recreation and the Office of Transportation and Infrastructure; in 2024 the closure ran from 7 a.m. Saturday to 7 a.m. Monday between the East Falls Bridge and Sweetbriar Drive. The city closed a four-mile stretch to cars in March 2020 to create recreational space during the COVID-19 pandemic, reopened it to traffic on August 4, 2021, and resumed weekend and holiday closures between the Falls Bridge and Eakins Oval.

By 2016 the trail had deteriorated over about two decades, with tree roots raising ridges in the pavement, and a $1.5 million restoration was proposed with $500,000 from the regional planning commission's Regional Trails Grant Program, a city match and an expected state grant. In 2021 the city described a $1.4 million project to completely reconstruct, rehabilitate and widen the trail. The rehabilitated Martin Luther King Jr. Drive Bridge, a $20 million federally funded project, reopened to vehicles on September 22, 2025, with a 10.5-foot shared-use path connecting to the trail.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Phila Franklin Inst, 4.2 km from the trail's middle, 13 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424554667685898780685646
Low °F283036465666717063514133
Precipitation, in3.63.34.544.14.84.854.94.23.44.3
Snow, in6.4420.10000000.13.5
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Philadelphia sheet (1:62,500); the 1949 Philadelphia sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19908399, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Philadelphia Celebrates the Re-opening of Martin Luther King Jr. Drive Bridge with Ribbon Cutting — City of Philadelphia (September 19, 2025) · government source · checked Oct 14, 2026
    Supports: Philadelphia Parks & Recreation's MLK Drive Trail, $20 million bridge rehabilitation funded by USDOT Bridge Formula Program, reopening to vehicles September 22, 2025, 10.5-foot shared-use path connecting to the trail
  3. MLK Drive Seasonal Weekend Closure for Recreation Returns on March 30 — City of Philadelphia (March 28, 2024) · government source · checked Oct 14, 2026
    Supports: seasonal weekend closures since 1995, 7 a.m. Saturday to 7 a.m. Monday, East Falls Bridge to Sweetbriar Drive, agencies overseeing the program
  4. MLK Drive Trail on track for $1.5 million restoration — PhillyVoice (June 2, 2016) · press · checked Oct 14, 2026
    Supports: four-mile route from the Falls Bridge, formerly West River Drive, access from Schuylkill Banks and the Schuylkill River Trail along Kelly Drive, two decades of deterioration, tree roots, $1.5 million cost, $500,000 DVRPC Regional Trails grant, city match, expected DCNR grant
  5. Martin Luther King Drive is reopening to vehicles this week, Philadelphia officials say — 6abc (August 2, 2021) · web · checked Oct 14, 2026
    Supports: four-mile stretch closed March 2020 for pandemic recreation, reopening August 4, 2021, $1.4 million project to reconstruct, rehabilitate and widen the trail, weekend and holiday closures Falls Bridge to Eakins Oval

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.