States › Illinois

Metro Bike Link Trail

Greenway in Illinois · OpenStreetMap relation

Runs through Fairview Heights, East St. Louis, Swansea, Belleville, Shiloh and O'Fallon · St. Clair County

Conditions now

Loading the weather near Belleville…

Forecast by the National Weather Service for Belleville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Saint Clair County.

Length
19.0 mi 30.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Metro Plaza Lane mile 4.4 directions to trailhead 1
  2. Parking at Enlisted Drive mile 4.5 directions to trailhead 2
  3. Parking at Metro Plaza Ln mile 4.5 directions to trailhead 3
  4. Parking at College Station Loop mile 8.1 directions to trailhead 4
  5. Parking at College Station Loop mile 8.1 directions to trailhead 5
  6. Metro Link Long Term Parking mile 8.2 directions to Metro Link Long Term Parking
  7. Parking mile 8.3 directions to trailhead 7
  8. Parking at Carlyle Avenue mile 11.1 directions to trailhead 8
  9. Parking at Carlyle Avenue mile 11.2 directions to trailhead 9
  10. Metro Bike Link Trail mile 11.9 directions to Metro Bike Link Trail
  11. Parking at Belleville Station Loop mile 11.9 directions to trailhead 11
  12. Parking at Scheel Street mile 11.9 directions to trailhead 12
  13. Metro Bike Link Trail mile 13.2 · water directions to Metro Bike Link Trail
  14. Parking at Tamaroa Lane mile 15.4 · water directions to trailhead 14
  15. Metro Bike Link Trail mile 18.9 directions to Metro Bike Link Trail
20040531 44 Metrolink Light Rail Belleville, IL (opens in a new tab)
20040531 44 Metrolink Light Rail Belleville, IL · Photo: David Wilson · CC BY 2.0 · Wikimedia Commons

About this trail

The MetroBikeLink Trail is a paved trail in St. Clair County, Illinois, that runs beside the MetroLink light-rail line for more than 18 miles, from the Fairview Heights Transit Center to near MidAmerica St. Louis Airport. The St. Clair County Transit District (SCCTD) built it and calls it the spine of its MetroBikeLink System of about 40 miles of connecting trails; the Metro East Park and Recreation District has helped with nearly every trail SCCTD has built. According to SCCTD, the trail follows the old CSX rail alignment and Schoenberger Creek through the Dutch Hollow area of Belleville and Fairview Heights, passing the site of the Winslow Mining Company, once a stop on the St. Louis and Southeastern Railway, which the Louisville and Nashville Railroad acquired in 1879.

The trail links seven Metro transit centers in five communities, among them Fairview Heights, Memorial Hospital, Swansea, Belleville, College and Shiloh-Scott. Connecting paths include the Orchard Loop Trail, a four-mile asphalt loop that leaves the main trail near the Fox Valley subdivision and crosses Eckert's Family Farm, and a 1.1-mile path from 66th and Main streets in Belleville through the Tecklenburg Forest Preserve, which crosses Illinois Route 161 and Schoenberger Creek on a 400-foot bridge.

The newest section, a 4.5-mile extension from the Shiloh-Scott Transit Center to near the airport, opened in June 2026 with a ribbon cutting and inaugural ride. Built from 2023 as part of the MetroLink extension to the airport, it has three bridges and no stops and passes through the Silver Creek Wetlands; it cost $6 million, of which SCCTD paid $5.5 million. SCCTD allows bicycles, including pedal-assist e-bikes, and bans gasoline-powered vehicles. The section between East Main Street and IL-159 was scheduled to close October 20-21, 2026, for sealcoating and striping.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Belleville Siu Rsch, 6.3 km from the trail's middle, 15 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434959717987908983735846
Low °F242836465664686557473728
Precipitation, in2.62.23.44.954.643.93.43.13.62.6
Snow, in3.43.3100000000.62.9
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Belleville sheet (1:62,500); the 1954 O'Fallon sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6624741, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. MetroBikeLink System – Ride. Walk. Bike. — St. Clair County Transit District · organization · checked Oct 14, 2026
    Supports: more than 40 miles of connecting trails; main artery beside MetroLink from near MidAmerica St. Louis Airport 18 miles to Fairview Heights Transit Center; seven transit centers in five communities; Metro East Park and Recreation District partnership; old CSX alignment, Schoenberger Creek, Dutch Hollow; Winslow Mining Company, St. Louis and Southeastern Railway, L&N 1879; Orchard Loop Trail; 1.1-mile path through Tecklenburg Forest Preserve with 400-ft bridge over IL 161 and Schoenberger Creek
  3. St. Clair County Transit District Celebrates Grand Opening of its $6 Million, 4.5-Mile MetroBikeLink Trail Extension — St. Clair County Transit District · organization · checked Oct 14, 2026
    Supports: 4.5-mile extension from Shiloh-Scott Transit Center to near MidAmerica airport; ribbon cutting and inaugural ride; construction 2023 to June 2026; three bridges, no stops, Silver Creek Wetlands; $6 million, SCCTD $5.5 million; spine of a 40-mile system; more than 18 miles
  4. Partners Encourage Use of MetroBikeLink System During National Bike to Work Week — St. Clair County Transit District · organization · checked Oct 14, 2026
    Supports: transit centers on the trail: Shiloh-Scott, College, Belleville, Swansea, Memorial Hospital, Fairview Heights (May 2025)
  5. SCCTD Trail Use Rules — St. Clair County Transit District · organization · checked Oct 14, 2026
    Supports: bicycles including pedal-assist e-bikes permitted; gasoline-powered vehicles prohibited
  6. SCCTD MetroBikeLink Notice: Upcoming Trail Closure, Oct. 20-21 — St. Clair County Transit District · organization · checked Oct 14, 2026
    Supports: East Main Street to IL-159 closure October 20-21, 2026, for sealcoating and striping

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.