States › Illinois

Richland Creek Bikeway

Greenway in Illinois · OpenStreetMap relation

Runs through Swansea · St. Clair County

Conditions now

Loading the weather near Swansea…

Forecast by the National Weather Service for Swansea · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Village of Swansea.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bobbie Drive mile 1.1 · restrooms directions to trailhead 1
Bicycle Bridge - panoramio (opens in a new tab)
Bicycle Bridge - panoramio · Photo: Brendan Carrillo · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Richland Creek Bikeway is a paved path of about 2 miles along Richland Creek in Swansea, Illinois. The St. Clair County Transit District uses the name, referring to the "Richland Creek Bikeway in Swansea" in announcing a trail that connects to it. Tourism and trail listings treat the path as the Swansea end of the Richland Creek Greenway Trail, a 3.8-mile asphalt route along the creek. TrailLink describes that route as two disconnected sections: a northern one past the woods of Centennial Park, and a southern one that shares about 0.2 mile with the MetroBikeLink Trail before continuing south through Belleville and seven city parks.

Centennial Park, St. Clair Township's nature park at 300 North Belt East where Route 161 meets Richland Creek, has a one-mile walking loop on both sides of the creek and an asphalt trail on its west side, and connects to the transit district's bike trail. That system, MetroBikeLink, runs 14 continuous miles beside the MetroLink light-rail tracks and links six transit centers; its first four miles, from Southwestern Illinois College to the Swansea MetroLink station, opened in 2002. The district awarded a $767,952 contract for Phase I of the Old Collinsville Road Trail, a roughly three-quarter-mile, 10-foot-wide asphalt path with a pedestrian bridge over Richland Creek, to tie the bikeway to Lebanon Avenue in Belleville and to a Phase II segment from Lake Lorraine Drive to Munie Road in Swansea.

The path is asphalt, with several bridges and views of the creek, and is flat except for one steep rise up to the MetroBikeLink Trail. Centennial Park has a restroom next to its parking lot, covered picnic tables, a bridge and a gazebo added in 2022, and interpretive signs along its trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

55% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Belleville Siu Rsch, 11.2 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434959717987908983735846
Low °F242836465664686557473728
Precipitation, in2.62.23.44.954.643.93.43.13.62.6
Snow, in3.43.3100000000.62.9
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Belleville sheet (1:62,500); the 1954 O'Fallon sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6573646, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. St. Clair County Transit District Awards Construction Contract for Phase I of the Old Collinsville Road Trail - St. Clair County Transit District · organization · checked Oct 15, 2026
    Supports: name "Richland Creek Bikeway in Swansea", Old Collinsville Road Trail Phase I contract, length, width, bridge, connections to Lebanon Avenue and Phase II (Lake Lorraine Drive to Munie Road), MetroBikeLink 14 continuous miles, six transit centers, first section opened 2002
  3. Richland Creek Greenway Trail - Discover Downstate Illinois · organization · checked Oct 15, 2026
    Supports: 3.8-mile asphalt greenway, several bridges, creek views, flat except one steep rise to MetroBikeLink Trail
  4. Centennial Park - St. Clair Township · web · checked Oct 15, 2026
    Supports: address and location at Richland Creek and Route 161, one-mile loop, asphalt trail on west side, connection to transit district bike trail, restroom, picnic tables, bridge, gazebo added 2022, interpretive signage
  5. Richland Creek Greenway Trail | Illinois Trails | TrailLink · web · checked Oct 15, 2026
    Supports: two disconnected sections, northern section by Centennial Park woods, 0.2 mile shared with MetroBikeLink Trail, southern section through Belleville and seven city parks

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.