States › Michigan

Michigan Air Line Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through Wixom, Walled Lake and Commerce Township · Oakland County

Conditions now

Loading the weather near Walled Lake…

Forecast by the National Weather Service for Walled Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
6.8 mi 11.0 km1
On former railbed
6.1 mi 89%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Trailhead Parking for WBT & MALT Trails mile 0 directions to Trailhead Parking for WBT & MALT Trails
  2. Parking at Haggerty Road mile 0 directions to trailhead 2
  3. Parking mile 0.1 directions to trailhead 3
  4. Parking at Easy Street mile 1.3 directions to trailhead 4
  5. Parking at Easy Street mile 1.3 directions to trailhead 5
  6. Parking at East West Maple Road mile 2 directions to trailhead 6
  7. Parking at East West Maple Road mile 2.3 directions to trailhead 7
  8. Parking at East West Maple Road mile 2.3 directions to trailhead 8
  9. Parking at North Pontiac Trail mile 2.3 directions to trailhead 9
  10. Michigan Air Line Trailhead Parking Lot mile 2.4 directions to Michigan Air Line Trailhead Parking Lot
  11. Parking at North Pontiac Trail mile 2.4 directions to trailhead 11
  12. Parking at Spring Park mile 2.4 directions to trailhead 12
  13. Parking mile 2.9 directions to trailhead 13
  14. ShearWater Trailhead Parking Lot for M.A.L.T. mile 4 directions to ShearWater Trailhead Parking Lot for M.A.L.T.
  15. Parking at Mettala Lane mile 4.6 · restrooms · water directions to trailhead 15
  16. Parking at Mettala Lane mile 4.7 · restrooms · water directions to trailhead 16
  17. Parking at Johanna Ware West mile 5.4 directions to trailhead 17
  18. Parking at Manistee Street mile 5.5 directions to trailhead 18
  19. Parking at Pontiac Trail mile 5.6 directions to trailhead 19
  20. Parking at Pontiac Trail mile 5.9 directions to trailhead 20
  21. Parking mile 6 directions to trailhead 21
Michigan Air Line Trail (opens in a new tab)
Photo: treestryder · CC BY-SA 4.0 · Mapillary

About this trail

The Michigan Air Line Trail is a rail-trail of a little over 7 miles through Wixom, Walled Lake and Commerce Township in western Oakland County, Michigan. It is managed by the Michigan Air Line Trailway Management Council (CW2), which the three communities formed in 2009 under an interlocal agreement. The trail follows the former Michigan Air-Line Railway, a short line from West Bloomfield to Wixom, where it met CSX; the railroad ran its last Michigan Star Clipper Dinner Train on December 31, 2008. Abandonment of the remaining 5.45 miles, from the Wixom interchange to Haggerty Road, was approved on October 18, 2011, and the track was removed in spring 2012. The name recalls a 19th-century plan for a railroad from Toronto to Chicago that would run as straight as a bird flies.

The council acquired the corridor in 2017 for $2.6 million. Phase one, about 5.5 miles of asphalt from Wixom Road to Haggerty Road, was built from March to September 2019 with a federal Transportation Alternatives grant through MDOT and a grant from the Ralph C. Wilson Jr. Foundation. A pedestrian bridge over M-5 that connects to the trail was finished in 2018 as part of a separate road project. Phase two, about 2.4 miles between Wixom Road and Old Plank Road through downtown Wixom, was built in 2022 and completed in 2023, when the council cut a ribbon for the downtown extension. The trail was designated a Pure Michigan Trail in 2026.

At its west end the trail connects with the Huron Valley Trail, and at Haggerty Road with the West Bloomfield Trail, which was built on the railroad's former eastern section. It is part of Route 1 of the Great Lake to Lake Trail between South Haven and Port Huron. Road crossings use push-button signals of two types, pedestrian hybrid (HAWK) beacons and rectangular rapid flashing beacons.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 81% of this route as a trail on former railroad right-of-way.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pontiac Oakland County International Airport, 15.8 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303343576978828073604635
Low °F161826364858626153423223
Precipitation, in1.61.11.92.73.73.22.82.93.12.621.6
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Pontiac sheet (1:62,500); the 1952 Walled Lake sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

2 Reddit threads about this trail, Jul 2025 to Apr 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Michigan Air Line Trail (opens in a new tab)
  1. 360° view 1 of 2, photo by treestryder
  2. 360° view 2 of 2, photo by treestryder
360° panorama · Photo: treestryder · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11545640, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “Open”
  3. Michigan Air-Line Railway — Wikipedia · organization · checked Oct 15, 2026
    Supports: short line West Bloomfield to Wixom with CSX connection; last Star Clipper Dinner Train December 31, 2008; eastern section sold for the West Bloomfield Trail; abandonment of 5.45 miles applied January 2011, approved October 18, 2011, track removed spring 2012; connections to the West Bloomfield and Huron Valley trails
  4. Our Trail — Michigan Air Line Trail (Michigan Air Line Trailway Management Council) · web · checked Oct 15, 2026
    Supports: over seven miles through three communities; Air Line name origin (Toronto to Chicago); 2009 council formation and interlocal agreement; 2017 acquisition; 2018 TAP and Ralph C. Wilson Jr. Foundation grants; phase one construction March-September 2019; phase two construction 2022, completed 2023; Pure Michigan Trail designation 2026
  5. Michigan Air Line Trail — Michigan rail-trail (council home page) · web · checked Oct 15, 2026
    Supports: completed in 2023; 2023 ribbon-cutting for the downtown Wixom extension
  6. Road Crossings — Michigan Air Line Trail · web · checked Oct 15, 2026
    Supports: HAWK and RRFB crossing signals, push-button activation, stop at all crossings
  7. The Michigan Air Line Trail is open to the public and awaiting approval for more trail construction — Metromode (April 29, 2021) · web · checked Oct 15, 2026
    Supports: CW2 council name; $2.6 million acquisition in 2017; phase one 5.5 miles of asphalt from Wixom Road to Haggerty Road; M-5 pedestrian bridge completed in 2018; phase two 2.4 miles between Old Plank Road and Wixom Road through downtown Wixom; Great Lake to Lake Trail Route 1 from South Haven to Port Huron

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.