States › Michigan

ITC Corridor Regional Trail

Greenway in Michigan

Runs through Novi · Oakland County

Conditions now

Loading the weather near Novi…

Forecast by the National Weather Service for Novi · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Start of ITC Corridor Regional Trail mile 0 directions to Start of ITC Corridor Regional Trail
  2. Parking at West 8 Mile Road mile 0.2 directions to trailhead 2
  3. ITC Corridor Trail Parking Lot mile 1.8 directions to ITC Corridor Trail Parking Lot
  4. Parking at West 11 Mile Road mile 3.8 directions to trailhead 4
  5. Parking mile 4.1 directions to trailhead 5
  6. Parking mile 4.1 directions to trailhead 6
  7. Parking mile 4.1 directions to trailhead 7
  8. Parking mile 4.3 directions to trailhead 8
  9. Parking mile 4.3 directions to trailhead 9
  10. Parking mile 4.3 directions to trailhead 10
  11. Parking at Providence Parkway mile 4.4 directions to trailhead 11
Novi, along the trail (opens in a new tab)
Novi, along the trail · Photo: Dwight Burdette · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The ITC Corridor Regional Trail, called the ITC Corridor Trail on the City of Novi's park pages, is a 4.66-mile path in Novi, Michigan, that follows a power-line utility corridor. The city describes it as a collaboration between the City of Novi and ITC Holdings Corp that runs the length of the city from north to south, connecting ITC Community Sports Park with the Ascension Providence Hospital campus. A 2022 city map of the project dates its pieces: the Maybury Connector and Phase 3A in 2013, Phase 1A and Phase 3B in 2016, the West Novi ITC CSP Trail in 2017, the 9 Mile to 11 Mile section in fall 2019 and the Wildlife Woods Connector in 2022, with a connection at the Ascension campus marked as future work. The city plans for the trail to link eventually with Maybury Park, the I-275 corridor and Hines Park in Northville, Livonia and Westland.

The southern end is at ITC Community Sports Park, 51000 Eight Mile Road. The city lists two more trailheads: the Nine Mile Road Trailhead, about 0.1 mile east of Garfield Road, and Wildlife Woods Park on Wixom Road. All three have parking. Restrooms open seasonally, May 1 to November 1, at the sports park and Wildlife Woods Park, and bike repair stations stand at the sports park and the Nine Mile Road Trailhead. The city also publishes a map of 1-mile, 5K and 10K routes on the trail.

The trail is paved except for a wooden boardwalk of about 2,000 feet. It is open from dawn to dusk, and stays open in winter but is not plowed or groomed. Class 1 e-bikes are allowed; other motor vehicles are not, apart from mobility devices for people with disabilities. Dogs must be leashed, and cyclists must yield to walkers and joggers.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Farmington, 13.6 km from the trail's middle, 71 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303444576878838174604735
Low °F161624344656605951403022
Precipitation, in2.31.82.133.63.33.23.23.42.62.52
Snow, in9.810.64.71.50000002.37.1
Old maps

USGS topographic maps of the trail's middle go back to the 1902 South Lyon sheet (1:62,500); the 1953 Salem sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. ITC Corridor Trail - City of Novi · government source · checked Oct 15, 2026
    Supports: 4.66-mile length, City of Novi and ITC Holdings collaboration, north-south route from ITC Community Sports Park to Ascension Providence campus, planned links to Maybury Park, I-275 corridor and Hines Park, trailheads and addresses, parking, seasonal restrooms, bike repair stations, 1-mile/5K/10K route map, dawn-to-dusk hours, winter not plowed, class 1 e-bikes, motor vehicle rule, dogs on leash, yield rule
  3. ITC Corridor Regional Trail: Alignment and Project Status (map, July 28, 2022) - City of Novi · government source · checked Oct 15, 2026
    Supports: project name ITC Corridor Regional Trail, construction dates of each phase (2013, 2016, 2017, fall 2019, 2022), future Ascension connection
  4. ITC Corridor Trail (Novi) | Michigan Trails | TrailLink · web · checked Oct 15, 2026
    Supports: paved surface with a 2,000-foot wooden boardwalk

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.