States › Michigan

Paved Bicycle Trail (Maybury State Park)

Greenway in Michigan

Runs through Northville Township · Wayne County

Conditions now

Loading the weather near Novi…

Forecast by the National Weather Service for Novi · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.8 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Mountain Bike Trailhead mile 0 · restrooms directions to Mountain Bike Trailhead
  2. Parking mile 0.8 · restrooms directions to trailhead 2
  3. Parking at Maybury Urban State Park Drive mile 0.9 · restrooms · water directions to trailhead 3
  4. Parking at Maybury Urban State Park Drive mile 0.9 · restrooms · water directions to trailhead 4
  5. Parking at Maybury Urban State Park Drive mile 0.9 · restrooms · water directions to trailhead 5
  6. Parking at Maybury State Park Drive mile 1.1 · restrooms directions to trailhead 6
  7. Parking at Maybury State Park Drive mile 1.2 · restrooms directions to trailhead 7
  8. Parking at Maybury State Park Drive mile 1.2 · restrooms directions to trailhead 8
  9. Parking mile 2.2 · restrooms directions to trailhead 9
Maybury Sanatorium (opens in a new tab)
Maybury Sanatorium · Photo: ellenm1 · CC BY 2.0 · Wikimedia Commons

About this trail

The paved bicycle trail in Maybury State Park is a 4-mile path in Northville Township, Michigan, in a 944-acre state park managed by the Michigan Department of Natural Resources. The park lies entirely on the Wayne County side of Eight Mile Road, which divides Northville from Novi in Oakland County. From 1919 the land held the Detroit Municipal Tuberculosis Sanatorium, later named for William H. Maybury, who led its development; the compound of about 40 buildings closed in 1969, and most of it had been torn down by 1975, when the DNR took over the site as Maybury State Park. The route mapped here is about 3.75 miles.

The park covers gently rolling terrain, mature woods and open meadows. Its paved paths are shared by walkers, people pushing strollers and cyclists, and the bicycle trail connects to The Link Regional Trail into Northville, the ITC trail and Hines Drive. The park's other trails are separate: about 6 miles of wooded hiking paths, 7 miles of single-track reserved for mountain bikes, closed for renovation in summer 2026, and 11 miles of bridle trails. In 2017 the City of Novi was building pathways from the park's Eight Mile Road entrance west to the ITC Sports Park and north to the ITC Corridor Trail.

The park is open year-round from 8 a.m. to 10 p.m., and entry requires a Michigan Recreation Passport. The park office and main entrance are at 49601 Eight Mile Road, with a second entrance at 20145 Beck Road and a non-motorized entrance on Seven Mile Road east of Ridge Road that has no vehicle parking. Class 1 e-bikes are allowed, Class 2 only with a DNR permit for mobility needs, and Class 3 not at all. In winter many of the paved paths are groomed for classic cross-country skiing.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

68% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Farmington, 14.3 km from the trail's middle, 68 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303444576878838174604735
Low °F161624344656605951403022
Precipitation, in2.31.82.133.63.33.23.23.42.62.52
Snow, in9.810.64.71.50000002.37.1
Old maps

USGS topographic maps of the trail's middle go back to the 1902 South Lyon sheet (1:62,500); the 1953 Salem sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. About the Park – Friends of Maybury State Park · organization · checked Oct 15, 2026
    Supports: Northville Township; 944 acres; terrain; 4-mile paved bicycle trail and its connections to The Link Regional Trail, the ITC trail and Hines Drive; shared paved-path use; winter grooming; hiking, mountain bike (closed summer 2026) and bridle trail mileage; hours; Recreation Passport; entrances and addresses; e-bike classes; sanatorium history 1919-1969 and DNR management from 1975
  3. Maybury State Park: A Trail Tale of Two County Connectivity – Oakland County Blog · web · checked Oct 15, 2026
    Supports: park managed by the Michigan DNR, entirely on the Wayne County side of Eight Mile Road between Novi and Northville; 2017 City of Novi pathway construction from the Eight Mile Road entrance to the ITC Sports Park and ITC Corridor Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.