States › Massachusetts

Northampton Bikeway

Rail-trail in Massachusetts

Runs through Northampton · Hampshire County

Conditions now

Loading the weather near Northampton…

Forecast by the National Weather Service for Northampton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Northampton Bikeway bridge over Beaver Brook, Leeds MA.jpg (opens in a new tab)
Northampton Bikeway bridge over Beaver Brook, Leeds MA.jpg · Photo: John Phelan · CC BY 4.0 · Wikimedia Commons

About this trail

This 0.7-mile paved section runs north from the village of Leeds, in Northampton, Massachusetts, toward Haydenville. It is part of the 5-mile Northampton rail trail west of downtown toward Look Park and Williamsburg, sometimes called the Francis P. Ryan Bikeway, which follows the former Williamsburg Branch of the New Haven & Northampton Company. The route is counted separately from the 104-mile main line of the Mass Central Rail Trail. The last unpaved rail trail section in Leeds was paved in 2019. In the winter of 2016–2017 a section about 1.5 miles west of Leeds was regraded and paved with a state Recreational Trails grant, bringing the trail into Haydenville at South Street.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 56% of this route as a trail on former railroad right-of-way.

Shade

88% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Amherst, 13.8 km from the trail's middle, 77 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343745587078838274625039
Low °F141524344555605850392921
Precipitation, in3.42.93.53.83.74.54.14.14.64.73.43.9
Snow, in8.1117.310000001.67.5
Old maps

USGS topographic maps of the trail's middle go back to the 1885 Northampton sheet (1:62,500); the 1948 Easthampton sheet (1:24,000) shows the area at mid-century. Browse all 22 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Mass Central Rail Trail — Wikipedia · organization · checked Oct 13, 2026
    Supports: 5-mile section west of downtown Northampton toward Look Park and Williamsburg, sometimes known as the Francis P. Ryan Bikeway, former New Haven & Northampton Company Williamsburg Branch, not included in the 104-mile tally
  3. Trail Improvements — Friends of Northampton Trails and Greenways · organization · checked Oct 13, 2026
    Supports: paving of the last unpaved section of rail trail in Leeds, 2019
  4. Mill River Greenway to be included in Route 9 rebuilds — Daily Hampshire Gazette (April 28, 2017) · press · checked Oct 13, 2026
    Supports: section about 1.5 miles west of Leeds regraded and paved the previous winter, Haydenville joined the rail trail system, dismount at South Street, Recreational Trails grant administered by DCR

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.