Mass Central Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Northampton, Amherst Town, Hardwick, Rutland, Holden, Hudson, Sudbury, Cambridge and 13 more · Hampshire, Worcester and Middlesex counties
All 21 towns and places
Northampton, Hadley, Amherst Town, Belchertown, Ware, Hardwick, New Braintree, Barre, Oakham, Rutland, Holden, West Boylston, Clinton, Berlin, Hudson, Sudbury, Wayland, Weston, Waltham, Cambridge and Somerville
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Mass Central Rail Trail (MCRT) is a partially completed rail trail between Northampton, Massachusetts and Boston along the right-of-way (ROW) of the former Massachusetts Central Railroad and former Central Massachusetts Railroad. It currently has 64 miles (103 km) open, and 92 miles (148 km) are open or protected for trail development. When complete, it will be 104 miles (167 km) long through Central Massachusetts and Greater Boston, forming the longest developing rail trail in Massachusetts. Many sections of the trail, including the Norwottuck Branch of the Mass Central Rail Trail and the Somerville Community Path, have been developed as separate projects but serve as part of the complete Mass Central Rail Trail. The Mass Central Rail Trail Alliance, a 501(c)(3) nonprofit that supports the build and operation of the MCRT, maintains an interactive map of the MCRT and other Massachusetts trails.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Boylston Street mile 2.8 directions to trailhead 1
- Parking at West Boylston Street mile 2.9 directions to trailhead 2
- Parking at West Boylston Street mile 2.9 directions to trailhead 3
- Parking at May Street mile 7.7 directions to trailhead 4
- Parking at Mass Central Rail Trail mile 10.5 directions to trailhead 5
- Parking at Manning Street mile 11.5 directions to trailhead 6
- Parking at Wachusett Street mile 13.7 directions to trailhead 7
- Mass Central Rail Trail Parking mile 20.3 directions to Mass Central Rail Trail Parking
- Mass Central Rail Trail Parking mile 22.3 directions to Mass Central Rail Trail Parking
- Mass Central Rail Trail Parking mile 23.8 directions to Mass Central Rail Trail Parking
- Parking at Whitehall Road mile 25.8 directions to trailhead 11
- Parking at Worcester Road mile 27.8 directions to trailhead 12
- Parking at Worcester Road mile 28.7 directions to trailhead 13
- Parking at Poverty Square Road mile 29.4 directions to trailhead 14
- Blue Trail Parking mile 39.5 directions to Blue Trail Parking
- Parking at Meadow Heights Drive mile 47.1 directions to trailhead 16
- Parking mile 47.3 directions to trailhead 17
- Parking at Palmer Road mile 47.3 directions to trailhead 18
- Parking at Franklin Street mile 51.6 directions to trailhead 19
- Parking at North Washington Street mile 53.7 directions to trailhead 20
- Parking at North Washington Street mile 53.8 directions to trailhead 21
- Parking at Bridge Street mile 55.6 directions to trailhead 22
- Parking at Jackson Street mile 55.9 directions to trailhead 23
- Parking at Warren Wright Road mile 60.7 directions to trailhead 24
- Parking at Warren Wright Road mile 60.7 directions to trailhead 25
- Rail Trail Parking mile 62.2 · restrooms directions to Rail Trail Parking
- Parking at Mill Lane mile 63.5 directions to trailhead 27
- Parking at Mill Lane mile 63.5 directions to trailhead 28
- Parking mile 64.3 directions to trailhead 29
- Parking at South Pleasant Street mile 64.7 directions to trailhead 30
- Parking mile 66.5 directions to trailhead 31
- Parking at South Maple Street mile 66.7 directions to trailhead 32
- Parking at South Maple Street mile 66.8 directions to trailhead 33
- Norwottuck Rail Trail: Mountain Farms Mall Parking mile 67 directions to Norwottuck Rail Trail: Mountain Farms Mall Parking
- Parking at Railroad Street mile 68.9 directions to trailhead 35
- Parking at Railroad Street mile 69 directions to trailhead 36
- Parking at Whalley Street mile 69.1 · restrooms directions to trailhead 37
- Parking at Railroad Street mile 69.1 · restrooms directions to trailhead 38
- Parking at West Street mile 69.2 directions to trailhead 39
- Parking at Damon Road mile 70.6 · restrooms directions to trailhead 40
- Parking at Water St mile 70.6 · restrooms directions to trailhead 41
- Parking at Bates Street mile 71 directions to trailhead 42
- Parking at Bates Street mile 71 directions to trailhead 43
- Parking at Bradford Street mile 71 directions to trailhead 44
- Parking at Stoddard Street mile 71.6 directions to trailhead 45
- Parking at Prospect Street mile 71.9 directions to trailhead 46
- Parking at Hatfield Street mile 72.6 directions to trailhead 47
- Parking at Straw Avenue mile 73.1 directions to trailhead 48
- Parking at Chestnut Street mile 73.3 directions to trailhead 49
- Parking at Bratton Court mile 73.4 directions to trailhead 50
- Parking at Bratton Court mile 73.4 directions to trailhead 51
- Parking at Wilder Place mile 73.4 directions to trailhead 52
- Parking at Keyes Street mile 73.5 directions to trailhead 53
- Parking at Keyes Street mile 73.5 directions to trailhead 54
- Parking at Depot Avenue mile 73.5 directions to trailhead 55
- Parking at Depot Avenue mile 73.5 directions to trailhead 56
- Parking at Depot Avenue mile 73.5 directions to trailhead 57
- Parking at North Maple Street mile 73.5 directions to trailhead 58
- Parking at Lower Memorial Park Drive mile 74.3 directions to trailhead 59
- Parking at Lower Pool Road mile 74.5 directions to trailhead 60
- Parking at Main Street mile 75.5 directions to trailhead 61
- Parking at Cobble Hill Road directions to trailhead 62
- Parking at Fitchburg Street directions to trailhead 63
- Parking directions to trailhead 64
- Parking at Medford Street directions to trailhead 65
- Parking directions to trailhead 66
- Parking directions to trailhead 67
- Parking at Elissa Avenue directions to trailhead 68
- Parking at Andrew Avenue directions to trailhead 69
- Parking at Garden Circle directions to trailhead 70
- Parking at Garden Lane directions to trailhead 71
- Parking at Garden Lane directions to trailhead 72
- Parking at Garden Lane directions to trailhead 73
- Parking at Garden Lane directions to trailhead 74
- Parking at Middlesex Road directions to trailhead 75
- Parking at Middlesex Road directions to trailhead 76
- Parking at Middlesex Road directions to trailhead 77
- Parking at Middlesex Road directions to trailhead 78
- Parking at Hillside Road directions to trailhead 79
- Parking at Hamlet Street directions to trailhead 80
- Parking at Albion Street water directions to trailhead 81
- Parking at Stevens Court water directions to trailhead 82
- Parking at Willoughby Street water directions to trailhead 83
- Parking at Waverley Oaks Road directions to trailhead 84
- Parking at Waverley Oaks Road directions to trailhead 85
- Parking at Waverley Oaks Road directions to trailhead 86
- Parking at Main Street directions to trailhead 87
- Parking at Boston Post Road directions to trailhead 88
- Parking at Boston Post Road directions to trailhead 89
- Parking at Mooney Street directions to trailhead 90
- Parking at Mooney Street directions to trailhead 91
- Parking at Vale Road directions to trailhead 92
- Parking at Church Street Extension directions to trailhead 93
- Parking at Mooney Street directions to trailhead 94
- Parking at Cambridgepark Drive directions to trailhead 95
- Parking at Main Street directions to trailhead 96
- Parking at Main Street directions to trailhead 97
- Parking at Main Street directions to trailhead 98
- Parking at Main Street directions to trailhead 99
- Parking at Prospect Hill Road directions to trailhead 100
- Parking at Stow Street directions to trailhead 101
- Parking at Stow Street directions to trailhead 102
- Parking at Edge Hill Road directions to trailhead 103
- Parking at Old Sudbury Road directions to trailhead 104
- Parking at Concord Road directions to trailhead 105
- Parking at Waverley Oaks Road directions to trailhead 106
- Parking at Third Street directions to trailhead 107
- Parking at Tufts Street water directions to trailhead 108
- Parking at Hammond Street directions to trailhead 109
- Parking at Medford Street water directions to trailhead 110
- Parking at Highland Avenue directions to trailhead 111
- Parking at Lexington Terrace directions to trailhead 112
- Parking at Emerson Road directions to trailhead 113
- Parking at Lexington Street directions to trailhead 114
- Parking at Waverley Oaks Road directions to trailhead 115
- Parking at Beaver Street directions to trailhead 116
- Parking at Rufo Road water directions to trailhead 117
- Parking at Sciarappa Street directions to trailhead 118
- Parking at Lillian Way directions to trailhead 119
- Parking at Summer Avenue directions to trailhead 120
- Parking at Lexington Terrace directions to trailhead 121
- Parking at Emerson Road directions to trailhead 122
- Parking at Emerson Road directions to trailhead 123
- Parking at Lexington Street directions to trailhead 124
- Parking at Lexington Street directions to trailhead 125
- Parking at Athletic Field Road directions to trailhead 126
- Parking at Third Street directions to trailhead 127
- Parking at Farmstead Lane directions to trailhead 128
- Parking at Millbrook Road directions to trailhead 129
- Parking at Millbrook Road directions to trailhead 130
- Parking at Education Street water directions to trailhead 131
- Parking at Station Road directions to trailhead 132
- Parking at Boston Post Road directions to trailhead 133
- Parking at Boston Post Road directions to trailhead 134
- Parking at Boston Post Road directions to trailhead 135
- Parking at Boston Post Road directions to trailhead 136
- Parking at Boston Post Road directions to trailhead 137
- Parking at Boston Post Road directions to trailhead 138
Plan your visit
- National Recreation TrailDesignated in 2014 National Recreation Trails database
- By trainAmtrak: Boston, MA (BON) 0.3 mi from the trail; Amtrak: Northampton, MA (NHT) 0.7 mi from the trail; Amtrak: Boston, MA (BOS) 1.3 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Mass Central Rail Trail is a multi-use trail being developed on the former Central Massachusetts Railroad corridor between Northampton and Boston. The Department of Conservation and Recreation (DCR) describes a planned 104-mile off-road route, of which more than 60 miles have been built. DCR, Wachusett Greenways, the East Quabbin Land Trust, the Clinton Greenway Conservation Trust and several towns manage sections. The Massachusetts Central Railroad, formed in 1869, ran trains 48 miles to Jefferson by 1881; the Boston and Maine leased its successor in 1887 and completed the line to Northampton that year. The 1938 hurricane severed the middle 24 miles, and the MBTA closed the Central Mass Branch in 1971.
The route mapped here measures 77.3 miles in many separate pieces. In the west, the paved Norwottuck Rail Trail runs 11 miles through Northampton, Hadley and Amherst, crossing the Connecticut River on a bridge first built in 1887, and connects at Northampton with the Manhan Rail Trail. Phase 1 of the New Braintree to Barre Plains section was completed in September 2026. Wachusett Greenways has built about 20 of a planned 30 miles between Barre and Sterling since 1997. In 2011 DCR leased about 20 miles from Waltham to Berlin from the MBTA; Weston–Wayland opened in 2019, Waltham finished 3 miles in 2023, and DCR built 7.5 miles from Sudbury to the Assabet River Rail Trail in Hudson in 2025.
The Norwottuck and Wayside sections are paved, the Wachusett Greenways sections are stone dust, and sections in Belchertown, Clinton and Berlin remain unimproved. The Norwottuck is open sunrise to sunset, with free parking in Northampton, Hadley and South Amherst. A 1.9-mile gap from Route 126 in Wayland to Sudbury has been designed by DCR for MassDOT to build.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 20% of this route as a trail on former railroad right-of-way.
- Shade
65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Barre Falls Dam, 7.3 km from the trail's middle, 20 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 38 46 59 70 78 83 81 74 62 50 40 Low °F 13 14 22 32 43 52 58 55 48 36 27 19 Precipitation, in 3.5 3 3.6 3.9 3.7 4.2 4.1 4.5 4.4 4.9 3.7 4.3 Snow, in 13.6 14.9 12.2 3.5 0 0 0 0 0 0.2 2.9 13.1 - Wildlife refuges
Passes beside Assabet River National Wildlife Refuge.
Passes beside Great Meadows National Wildlife Refuge.
Passes beside Silvio O. Conte National Fish and Wildlife Refuge.
- On the National Register
- Linden Street Bridge, Waltham · structure, listed 1989 · nomination file for Linden Street Bridge
- Ware--Hardwick Covered Bridge, Ware · structure, listed 1986 · nomination file for Ware--Hardwick Covered Bridge
- Wachusett Dam Historic District, Clinton · historic district, listed 1990 · nomination file for Wachusett Dam Historic District
- Wachusett Aqueduct Linear District, Clinton · historic district, listed 1990 · nomination file for Wachusett Aqueduct Linear District
- Church Street Historic District, Ware · historic district, listed 1986 · nomination file for Church Street Historic District
- Belchertown State School, Belchertown · historic district, listed 1994 · nomination file for Belchertown State School
- Gilbertville Historic District, Hardwick · historic district, listed 1991 · nomination file for Gilbertville Historic District
- Wayland Center Historic District, Wayland · historic district, listed 1974 · nomination file for Wayland Center Historic District
- Oakdale Village Historic District, West Boylston · historic district, listed 1996 · nomination file for Oakdale Village Historic District
- Boston Post Road Historic District, Weston · historic district, listed 1983 · nomination file for Boston Post Road Historic District
- Westside Historic District, Amherst · historic district, listed 2000 · nomination file for Westside Historic District
- Northampton Veterans Administration Hospital Historic District, Northampton · historic district, listed 2012 · nomination file for Northampton Veterans Administration Hospital Historic District
And 1 more within 100 m of the trail.
- Old maps
USGS topographic maps of the trail's middle go back to the 1885 Worcester sheet (1:62,500); the 1950 Paxton sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Community
What riders say on Reddit
- Riders in 2025 and 2026 bypassed the unfinished Wayland-to-Sudbury gap on Pelham Island Road, which they called quiet and pleasant, then Landham Road, described as busy; some used its sidewalk. r/bikeboston, Apr 2025 · r/bikeboston, Jul 2025 · r/bikeboston, May 2026 · r/bikeboston, Oct 2026
- Riders in 2025 and 2026 described the unofficial rail bridge over Route 128 in Waltham as passable, though unimproved; one walked a bike across, and another preferred a Jones Road sidewalk alternative. r/bikeboston, Jul 2025 · r/bikeboston, Mar 2026 · r/bikeboston, May 2026
- Riders in spring 2025 reported paving of the Sudbury-to-Hudson section beginning in late April, a first coat down by mid-May, and a new construction fence near the Eversource lot by late May. r/bikeboston, Apr 2025 · r/bikeboston, May 2025 · r/bikeboston, May 2025 · r/bikeboston, May 2025
- After snow in March 2026, riders said the Weston-to-Sudbury stretch was not clear and parts of Waltham were unsuitable for biking, while one rider said the Boston and Northampton ends were plowed. r/bikeboston, Mar 2026
40 Reddit threads about this trail, Apr 2024 to Oct 2026
- Waltham to Sudbury mass central trail r/bikeboston · May 2026 · 9 comments
- Mass Central Rail Trail r/bikeboston · Jul 2025 · 22 comments
- Follow up from glorious dirt post. Paving on 7.6 miles of Hudson-Sudbury Mass Central Rail Trail - Wayside has begun. In the works for decades. Likely paved in weeks. r/bikeboston · Apr 2025 · 22 comments
- Mass Central Rail Trail—Wayside from Waltham to Berlin now 71% complete (was 37% last year) r/bikeboston · Mar 2026 · 22 comments
- Not yet "open" but 7.6 Miles of the Mass Central Rail Trail - Wayside in Sudbury-Hudson is newly paved as of today r/bikeboston · May 2025 · 6 comments
- Even if the Mass Central Rail Trail is unfinished, is it still bikable for a long way out of Cambridge/Waltham off road? r/bikeboston · May 2025 · 7 comments
- MCRT clear? r/bikeboston · Mar 2026 · 5 comments
- What Central Mass rail trail would you choose for taking a less experienced cyclist on a morning ride? r/bikeboston · Oct 2026 · 18 comments
- Full MCRT route? r/bikeboston · Jun 2024 · 21 comments
- Route Rec: Cambridge-Waltham r/bikeboston · Oct 2024 · 28 comments
- Recomendations for Tourist 60 mile loop from back bay ? r/bikeboston · Oct 2026 · 14 comments
- Family Bike Rides? r/bikeboston · May 2026 · 12 comments
- Rail Trails or Other Areas with Minimal Street Crossings? r/bikeboston · May 2026 · 37 comments
- Which rail trails are plowed? r/massachusetts · Feb 2026 · 5 comments
- Cycling advice Boston r/bikeboston · Feb 2026 · 21 comments
- Linden Street bridge on Mass Central Rail Trail, Waltham - OPEN! r/bikeboston · Dec 2025 · 10 comments
- Celebrating the winter solstice r/bikeboston · Dec 2025 · 26 comments
- How have I never heard of the rail/trail bike network in Massachusetts before? Mind blowing r/massachusetts · Dec 2025 · 40 comments
- Mass Central Railroad / Framingham & Lowell Railroad Diamond, plus Sudbury Section House & former Station markers. Massachusetts, November 2025 r/rustyrails · Dec 2025 · 6 comments
- Bike visit r/bikeboston · Oct 2025 · 16 comments
- Fresh pavement, newly refurbished ADA accessible bridge, newly planted native trees and vegetation, and new osprey nest platform in Sudbury, on the Mass Central Rail Trail - Wayside r/bikeboston · May 2025 · 17 comments
- Bicycle touring question, Hudson/West Boylston area, unmanaged Mass Central Rail Trail gaps r/massachusetts · Apr 2025 · 4 comments
- Mass Central Rail Trail- soon to be paved from Hudson to Sudbury but gloriously dirty for now r/bikeboston · Apr 2025 · 30 comments
- How much of red from Cambridge to Sudbury is easily navigable today? I don't mind a mile or two of gravel- I am more interested in off-street continuity and minimizing detours. r/bikeboston · Apr 2025 · 11 comments
- What are some good towns to bike to around here? r/bikeboston · Apr 2025 · 22 comments
- Mass Central Rail Trail in Waltham to be closed intermittently this month r/bikeboston · Apr 2025 · 3 comments
- Linden Street railroad bridge may be restored by end of 2025 r/bikeboston · Mar 2025 · 6 comments
- Favorite long ride routes for a nature lover? r/bikeboston · Jan 2025 · 21 comments
- The failures of "Protect Sudbury", which sought to legally destroy the Mass Central Rail Trail - Wayside, along with a buried power reliability project that also built the trail, are now complete r/bikeboston · Dec 2024 · 21 comments
- History of the 23 mile Mass Central Rail Trail—Wayside, 1971 - October 2024 (Today, over 70% complete or under construction for 2025, all remaining sections in design) r/bikeboston · Oct 2024 · 23 comments
- Looking for a Doable Section of MCRT r/bikeboston · Oct 2024 · 4 comments
- Perfect fall weekend in Massachusetts! r/gravelcycling · Sep 2024 · 5 comments
- Construction started (for real this time) on the Mass Central Rail Trail Waltham-Weston, Phase 1, the bridge over the MBTA Fitchburg Line, FYI. r/bikeboston · Jul 2024 · 14 comments
- Favorite rides in the New England/ Boston area? r/bikeboston · Jul 2024 · 16 comments
- NBD and new to the gravel world! r/gravelcycling · Jun 2024 · 13 comments
- Bridges of the Mass Central Rail Trail — A Status Update In Pictures r/bikeboston · Jun 2024 · 7 comments
- The MCRT bridge over the Fitchburg tracks is still very much open r/bikeboston · May 2024 · 12 comments
- Safest Route Through Waltham to Weston-Waltham Bridge (MCRT) r/bikeboston · May 2024 · 22 comments
- Weston-Waltham Bridge to MCRT Closed r/bikeboston · May 2024 · 61 comments
- Mass Central Rail Trail Weston-Waltham Phase 1 Notice to Proceed with Construction r/Waltham · Apr 2024 · 7 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMass Central Rail Trail Alliance
- Trail organizationWachusett Greenways (Barre–Sterling sections)
- Agency noticesDCR: Mass Central Rail Trail – Wayside
- FacebookMass Central Rail Trail (Facebook)
- RedditSearch Reddit: r/massachusetts
Nearby trails
- Assabet River Rail Trail within 0.2 mi · 8.8 mi, paved
- Massachusetts Central Rail Trail within 0.2 mi · 1.8 mi, gravel
- Alewife Linear Park within 0.2 mi · 1.3 mi, paved
- Northampton Bikeway within 0.2 mi · 0.7 mi, paved
- Bruce Freeman Rail Trail within 0.2 mi · 19.9 mi, paved
- Minuteman Bikeway within 0.2 mi · 10.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6674358, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Mass Central Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q22073847, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Mass Central Rail Trail - Wayside — Mass.gov (Department of Conservation and Recreation) · government source · checked Oct 13, 2026 Supports: envisioned 104-mile route Boston to Northampton on the former Central Massachusetts Railroad corridor, over 60 miles built, 2011 DCR lease from the MBTA of about 20 miles Waltham to Berlin, Weston–Wayland opened 2019, Waltham 3 miles 2023, Sudbury–Hudson 7.5 miles built 2025 to the Assabet River Rail Trail, 1.9-mile Route 126 Wayland to Sudbury segment designed by DCR to be built by MassDOT
- Norwottuck Rail Trail — Mass.gov (Department of Conservation and Recreation) · government source · checked Oct 13, 2026 Supports: 11-mile paved trail, sunrise to sunset, free parking at Elwell Recreation Area (Northampton), Railroad Street (Hadley) and Station Road (South Amherst), west end connects with the Manhan Rail Trail
- Mass Central Rail Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: managers (DCR, Wachusett Greenways, East Quabbin Land Trust, Clinton Greenway Conservation Trust, towns), railroad formed 1869, 48 miles to Jefferson by 1881, Boston and Maine lease and completion 1887, 1938 hurricane severed middle 24 miles, MBTA closure 1971, Norwottuck bridge first built 1887, New Braintree to Barre Plains phase 1 completed September 2026, Wachusett Greenways about 20 of 30 miles and first section 1997, surfaces by section, unimproved Belchertown, Clinton and Berlin sections
- Mass Central Rail Trail — MCRT Alliance · organization · checked Oct 13, 2026 Supports: about 104 miles from Northampton to Boston, still developing, partner organizations
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

