States › Massachusetts

Alewife Linear Park

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Cambridge and Somerville · Middlesex County

Conditions now

Loading the weather near Somerville…

Forecast by the National Weather Service for Somerville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.0 km1
On former railbed
1.0 mi 77%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Maxwells Green mile 0.1 directions to trailhead 1
  2. Parking at Maxwells Green mile 0.1 directions to trailhead 2
  3. Parking at Maxwells Green mile 0.1 directions to trailhead 3
  4. Parking at Maxwells Green mile 0.1 directions to trailhead 4
  5. Parking at Whipple Street mile 0.6 directions to trailhead 5
  6. Parking at Willow Avenue mile 0.6 directions to trailhead 6
  7. Parking at West Street mile 0.7 directions to trailhead 7
  8. Rite Aid Lot mile 0.8 · water directions to Rite Aid Lot
  9. Rite Aid Rear Lot mile 0.8 · water directions to Rite Aid Rear Lot
  10. Parking at Winter Street mile 0.9 · water directions to trailhead 10
  11. Parking at Winter Street mile 0.9 · water directions to trailhead 11
  12. Parking at Day Street mile 1 · water directions to trailhead 12
  13. Parking at Dover Street mile 1 directions to trailhead 13
  14. Parking at Dover Street mile 1 directions to trailhead 14
  15. Parking at Elmwood Street mile 1.2 directions to trailhead 15
  16. Parking at Shea Road mile 1.2 · water directions to trailhead 16
  17. Parking at Elmwood Street mile 1.3 · water directions to trailhead 17
  18. Parking at Camp Street mile 1.3 · water directions to trailhead 18
  19. Parking at Harvey Street mile 1.4 · water directions to trailhead 19
  20. Parking at Massachusetts Avenue mile 1.4 · water directions to trailhead 20
  21. Parking at Massachusetts Avenue mile 1.4 directions to trailhead 21
  22. Parking at Massachusetts Avenue mile 1.4 directions to trailhead 22
Alewife Linear Park in autumn.JPG (opens in a new tab)
Alewife Linear Park in autumn.JPG · Photo: Hertz1888 · Public domain · Wikimedia Commons

About this trail

Alewife Linear Park, usually called Linear Park, is a paved path in North Cambridge and Somerville, Massachusetts, between Alewife station and Davis Square, mapped here as about 1.3 miles in several pieces. The MBTA completed the park and path in 1985 as part of the Red Line Extension, and much of it lies over the Red Line tunnel between Davis and Alewife stations. The corridor is that of the Fitchburg Cutoff railroad, whose eastern part opened in 1870 and carried only Boston and Maine freight trains after 1926; it was abandoned as far east as Cedar Street in 1979 to make way for the subway.

At Alewife the path links directly to the Minuteman Bikeway. A brick path leads to Davis station, and east of Davis Square the corridor continues as the Somerville Community Path, which took in part of the park in 1994; the City of Cambridge describes the combined route as about 2 miles from Alewife to Cedar Street in Somerville. Where the path meets Massachusetts Avenue, the city has realigned the Cedar Street intersection and added crosswalks and a signalized bicycle crossing.

The paved surface dates from the 1985 construction and has deteriorated. Cambridge's Linear Park Redesign covers the stretch from the Russell Field fieldhouse to the Somerville line north of Massachusetts Avenue: it widens the path from about 10 feet to about 14 feet where possible and addresses drainage, lighting and bicycle and pedestrian conflicts. Residents sued over the $7.2 million project's effect on trees, and in August 2025 a judge briefly halted preparatory work. Design was completed by October 2025, construction passed to the Department of Public Works, and signed pedestrian and bicycle detours were put in place.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

27% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boston Logan International Airport, 9.7 km from the trail's middle, 5 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946566676828073625242
Low °F232531415060666558483829
Precipitation, in3.43.24.23.63.23.93.33.23.643.74.3
Snow, in14.314.491.6000000.20.79
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston North sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 147544, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Linear Park Redesign — City of Cambridge Community Development · government source · checked Oct 13, 2026
    Supports: completed 1985 by the MBTA with the Red Line Extension; over the Red Line tunnel between Davis and Alewife; deteriorated path; redesign extent Russell Field fieldhouse to the Somerville line; widening, drainage, lighting, conflicts; design complete by October 2025; construction with DPW; signed detours
  3. Belmont - Cambridge - Somerville Path — City of Cambridge · government source · checked Oct 13, 2026
    Supports: about 2 miles from Alewife to Cedar Street in Somerville; called the Somerville Community Path east of Davis; links to the Minuteman Bikeway; brick path to Davis station; Massachusetts Avenue/Cedar Street crossing realignment and signalized bike crossing
  4. Somerville Community Path — Wikipedia · organization · checked Oct 13, 2026
    Supports: Fitchburg Cutoff, eastern part opened 1870, B&M freight only after 1926, abandoned to Cedar Street in 1979 for the Red Line Northwest Extension; Linear Park opened Alewife to Davis 1985; part became the Community Path in 1994
  5. Court halts Cambridge path work for now — The Boston Globe · press · checked Oct 13, 2026
    Supports: $7.2 million renovation widening the path from about 10 to about 14 feet; residents' lawsuit over trees; August 2025 court order halting preparatory work

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.