States › Massachusetts

Dr. Paul Dudley White Path

Greenway in Massachusetts

Runs through Newton, Watertown Town, Boston and Cambridge · Middlesex and Suffolk counties

Conditions now

Loading the weather near Boston…

Forecast by the National Weather Service for Boston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
17.0 mi 27.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. E51 Lot mile 1 · water directions to E51 Lot
  2. Parking at Amherst Street mile 1 · water directions to trailhead 2
  3. Parking at Amherst Street mile 1.1 · water directions to trailhead 3
  4. Parking at Amherst Street mile 1.5 directions to trailhead 4
  5. Parking at Amherst Alley mile 1.7 directions to trailhead 5
  6. Parking at Audrey Street mile 2 directions to trailhead 6
  7. Parking at Vassar Street mile 2.2 · water directions to trailhead 7
  8. Parking at Vassar Street mile 2.2 · water directions to trailhead 8
  9. Parking at Vassar Street mile 2.2 · water directions to trailhead 9
  10. Parking at Vassar Street mile 2.3 · water directions to trailhead 10
  11. Parking at Waverly Street mile 2.3 directions to trailhead 11
  12. Magazine Beach Parking mile 2.5 · water directions to Magazine Beach Parking
  13. Parking at Magazine Street mile 2.7 · water directions to trailhead 13
  14. Parking at Magazine Street mile 2.7 · restrooms · water directions to trailhead 14
  15. Parking at Riverside Road mile 2.8 · restrooms directions to trailhead 15
  16. Parking at Riverside Road mile 2.8 · restrooms directions to trailhead 16
  17. Parking at Pleasant Street Extension mile 2.9 directions to trailhead 17
  18. Parking at Pleasant Street Extension mile 2.9 directions to trailhead 18
  19. Parking at River Street mile 3 directions to trailhead 19
  20. Parking at River Street mile 3 · water directions to trailhead 20
  21. Parking at Western Avenue mile 3.2 · water directions to trailhead 21
  22. Parking at Peabody Terrace mile 3.4 · water directions to trailhead 22
  23. Parking at Revere Street mile 4.1 directions to trailhead 23
  24. Parking at Mount Auburn Street mile 4.5 · water directions to trailhead 24
  25. Parking at Greenough Boulevard mile 4.7 · water directions to trailhead 25
  26. Parking at Greenough Boulevard mile 4.9 directions to trailhead 26
  27. Parking at Greenough Boulevard mile 4.9 directions to trailhead 27
  28. Parking at Coolidge Avenue mile 5.6 directions to trailhead 28
  29. Parking at Coolidge Avenue mile 5.6 directions to trailhead 29
  30. Parking at Forge Road mile 5.9 directions to trailhead 30
  31. Parking at Greenough Boulevard mile 5.9 directions to trailhead 31
  32. Parking at Forge Road mile 5.9 directions to trailhead 32
  33. Parking at Greenough Boulevard mile 5.9 directions to trailhead 33
  34. Parking at Western Avenue mile 6.1 directions to trailhead 34
  35. Parking at Western Avenue mile 6.2 directions to trailhead 35
  36. Parking at Soldiers Field Road mile 6.2 directions to trailhead 36
  37. Parking at Soldiers Field Road mile 6.4 directions to trailhead 37
  38. Parking at Soldiers Field Road mile 6.4 directions to trailhead 38
  39. Parking at Soldiers Field Road mile 6.7 · water directions to trailhead 39
  40. Parking at Soldiers Field Road mile 7 directions to trailhead 40
  41. Parking at Soldiers Field Road mile 7.1 directions to trailhead 41
  42. Parking at Soldiers Field Road mile 7.2 directions to trailhead 42
  43. Parking at Harry Agganis Way mile 9.3 directions to trailhead 43
  44. Parking at Harry Agganis Way mile 9.3 directions to trailhead 44
  45. Boston University Lot H (Bridge) mile 9.7 directions to Boston University Lot H (Bridge)
  46. Parking at Commonwealth Avenue mile 9.7 directions to trailhead 46
  47. Parking at Commonwealth Avenue mile 10 directions to trailhead 47
  48. Parking at Back Street mile 10.7 directions to trailhead 48
  49. Parking at Back Street mile 10.9 directions to trailhead 49
  50. Parking at Back Street mile 11.3 · restrooms · water directions to trailhead 50
  51. Parking at David G. Mugar Way mile 11.7 · restrooms · water directions to trailhead 51
  52. Parking at Cambridge Street mile 12.1 directions to trailhead 52
  53. Parking at Fruit Street mile 12.1 directions to trailhead 53
  54. Parking at Blossom Street mile 12.2 · water directions to trailhead 54
  55. Parking at Storrow Drive mile 12.4 directions to trailhead 55
  56. Parking at Charles River Road directions to trailhead 56
  57. Parking at Water Street directions to trailhead 57
  58. Parking at North Beacon Street directions to trailhead 58
  59. Parking at Nonantum Road directions to trailhead 59
  60. Parking at Nonantum Road directions to trailhead 60
  61. Parking at Kingsbury Avenue directions to trailhead 61
  62. Parking at Nonantum Road water directions to trailhead 62

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Demolition of Span 2 over Storrow Drive (opens in a new tab)
Demolition of Span 2 over Storrow Drive · Photo: MassDOT · Public Domain Mark · Flickr

About this trail

The Dr. Paul Dudley White Bike Path is a paved shared-use path that loops along both banks of the Charles River between the Museum of Science in Boston and Watertown Square, a circuit of about 17 miles. It lies within the Charles River Reservation, which the Massachusetts Department of Conservation and Recreation (DCR) describes as a 20-mile reservation along the river with more than 20 miles of trails for biking, walking and running. The reservation was proposed in 1893 by Charles Eliot and Sylvester Baxter in a report of the Metropolitan Park Commission. The path is named for the cardiologist Paul Dudley White, an advocate of preventive medicine who prescribed bicycle therapy to President Dwight Eisenhower after his 1955 heart attack, and was certified as a National Recreation Trail on January 13, 1976, with the Metropolitan District Commission listed as its manager.

From the Museum of Science on the Charles River Dam Bridge, the path follows sidewalks and striped asphalt upstream to the Galen Street (Route 16) bridge at Watertown Square. Its north side borders Cambridge and Watertown; its south side passes the West End, the Back Bay and Allston-Brighton. At the eastern end it links to North Point Park in Cambridge and Nashua Street Park in Boston, and at the western end the Charles River Bike Path continues upstream through Newton and Waltham.

The reservation is open from sunrise to sunset, with DCR parking at Herter Park and the Watertown Dam. Street crossings and narrow passing are the main hazards, and some parts are not plowed in winter. The Cambridge-side path from the Longfellow Bridge to the Boston University boathouse was rebuilt in 2015–16. After a cyclist was killed near the BU Bridge in September 2024, DCR widened the river-side sidewalks approaching that bridge, and reconstruction of Memorial Drive from JFK Street to the Eliot Bridge, with a separate, wider bicycle path, began in 2026.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boston Logan International Airport, 8.8 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946566676828073625242
Low °F232531415060666558483829
Precipitation, in3.43.24.23.63.23.93.33.23.643.74.3
Snow, in14.314.491.6000000.20.79
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston South sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Charles River Reservation — Mass.gov (Department of Conservation & Recreation) · government source · checked Oct 13, 2026
    Supports: DCR management, 20-mile reservation, over 20 miles of trails for biking, walking and running, sunrise-to-sunset hours, parking at Herter Park and Watertown Dam
  3. Charles River Bike Path — Wikipedia · organization · checked Oct 13, 2026
    Supports: Museum of Science to Watertown Square loop of 17.1 miles, Charles River Dam Bridge and Galen Street (Route 16) endpoints, sidewalk and striped asphalt, neighborhoods on each side, North Point Park and Nashua Street Park links, continuation through Newton and Waltham, naming for Paul Dudley White and Eisenhower bicycle therapy, street crossings and narrow passing, winter plowing, 2015–16 rebuild from the Longfellow Bridge to the BU boathouse
  4. Memorial Drive (Cambridge) — Wikipedia · organization · checked Oct 13, 2026
    Supports: sidewalk widening near the BU Bridge after the September 2024 death of a cyclist; Phase III reconstruction from JFK Street to the Eliot Bridge with a separate, wider bicycle path, begun 2026
  5. Charles River Reservation — The Cultural Landscape Foundation · organization · checked Oct 13, 2026
    Supports: 1893 proposal by Charles Eliot and Sylvester Baxter in a Metropolitan Park Commission report; path loops the Basin from the Charles River Dam to Watertown Square
  6. Dr. Paul Dudley White Bike Path — National Recreation Trails database · organization · checked Oct 13, 2026
    Supports: National Recreation Trail certification January 13, 1976; Metropolitan District Commission as managing agency

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.