Length
2.7 mi 4.3 km1
On former railbed
0.7 mi 28%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Homer Avenue mile 0.6 directions to trailhead 1
  2. Parking at Homer Avenue mile 0.7 directions to trailhead 2
  3. Parking at Aberdeen Way mile 0.7 directions to trailhead 3
  4. Parking at Homer Avenue mile 0.7 directions to trailhead 4
  5. Parking at Homer Avenue mile 0.7 directions to trailhead 5
  6. Parking at Norseman Avenue mile 1 directions to trailhead 6
  7. Parking at School Lane mile 1.1 directions to trailhead 7
  8. Parking at School Lane mile 1.1 directions to trailhead 8
  9. Parking at Grove Street mile 1.2 directions to trailhead 9
  10. Parking at Grove Street mile 1.3 directions to trailhead 10
  11. Parking at Nichols Avenue mile 1.5 directions to trailhead 11
  12. Parking at Arsenal Way mile 1.6 directions to trailhead 12
  13. Parking at Arsenal Way mile 1.6 directions to trailhead 13
  14. Parking at Arsenal Way mile 1.7 directions to trailhead 14
  15. Parking at Arsenal Way mile 1.8 directions to trailhead 15
  16. Parking at Arsenal Way mile 1.8 directions to trailhead 16
  17. Parking at Arsenal Way mile 1.8 directions to trailhead 17
  18. Parking at Arsenal Way mile 1.8 directions to trailhead 18
  19. Parking at Arsenal Street mile 1.9 directions to trailhead 19
  20. Parking at Arsenal Street mile 1.9 directions to trailhead 20
  21. Parking at Arsenal Street mile 1.9 directions to trailhead 21
  22. Parking at Dexter Avenue mile 2 directions to trailhead 22
  23. Parking at Dexter Avenue mile 2 directions to trailhead 23
  24. Parking at Arsenal Street mile 2 directions to trailhead 24
  25. Parking at Arsenal Street mile 2 directions to trailhead 25
  26. Parking at Arsenal Street mile 2 directions to trailhead 26
  27. Parking at Arsenal Street mile 2 directions to trailhead 27
  28. Parking at Arsenal Street mile 2.2 directions to trailhead 28
  29. Parking at Walnut Street mile 2.3 directions to trailhead 29
  30. Parking at Arsenal Street mile 2.3 directions to trailhead 30
  31. Parking at Arsenal Street mile 2.4 directions to trailhead 31
  32. Parking at Arsenal Street mile 2.6 directions to trailhead 32
  33. Parking at Arsenal Street mile 2.6 directions to trailhead 33
  34. Parking at North Beacon Street mile 2.7 directions to trailhead 34
  35. Parking at Arsenal Street mile 2.7 directions to trailhead 35
Watertown-Cambridge Greenway (opens in a new tab)
Photo: mapillary01730 · CC BY-SA 4.0 · Mapillary

About this trail

The Watertown-Cambridge Greenway is a multi-use path on the former Boston and Maine Railroad's Watertown Branch, between East Watertown and Fresh Pond in Cambridge, Massachusetts. The City of Cambridge gives its length as 1.25 miles, from the intersection of Arlington Street, Nichols Avenue and Crawford Street in Watertown to the Cambridge Water Department entrance at Fresh Pond; this record maps about 2.7 miles, taking in the earlier path in Watertown as well. The Department of Conservation and Recreation (DCR) and the City of Cambridge jointly bought the corridor in June 2013: DCR holds the section south of Huron Avenue and Cambridge the section north to Concord Avenue.

The branch was chartered in 1846, taken over by the Fitchburg Railroad before track was laid, and reached Watertown by 1849, with stops at Mount Auburn and Fresh Pond; by 1851 it joined the Fitchburg main line at Waltham. The Boston and Maine took over the Fitchburg in 1900. Passenger service ended on July 9, 1938, the line through Watertown Square was abandoned in 1960, and abandonment of the last 1.72 miles, to the Fitchburg line in Cambridge, was approved on October 5, 2011. MassDOT opened the first trail section, School Street to Arlington Street in Watertown, in 2011. Greenway construction began in August 2018, with a groundbreaking on December 5, 2018, and Cambridge reported the path open in June 2022.

Paved entrances in Cambridge are the Fresh Pond water treatment plant driveway, Holworthy Place and Holworthy Avenue near Mount Auburn Street; unpaved entrances come from the Fresh Pond perimeter path, Huron Avenue and the back of the Star Market parking lot. Near the Walter J. Sullivan Water Treatment Facility the greenway meets the Fresh Pond Trail. Cambridge describes it as a link between the Charles River paths, the Minuteman Bikeway, the Alewife Greenway and the Mystic River Reservation.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boston Logan International Airport, 11.9 km from the trail's middle, 6 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946566676828073625242
Low °F232531415060666558483829
Precipitation, in3.43.24.23.63.23.93.33.23.643.74.3
Snow, in14.314.491.6000000.20.79
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Newton sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Watertown, 1890s: Railway station on Church Street
Watertown, 1890s: Railway station on Church StreetPhoto: Watertown Free Public Library · Contact host institution for more information. · Digital Public Library of America (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13472744, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Watertown-Cambridge Greenway — City of Cambridge Community Development Department · government source · checked Oct 13, 2026
    Supports: 1.25 miles from Arlington Street/Nichols Avenue/Crawford Street to the Cambridge Water Department entrance, B&M Watertown Branch, joint DCR–Cambridge purchase June 2013, construction from August 2018 and December 5, 2018 groundbreaking, open as of June 2022, paved and unpaved entrances, connections to the Charles River paths, Minuteman Bikeway, Alewife Greenway and Mystic River Reservation
  3. Watertown Branch Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: 1846 charter, Fitchburg control, Watertown reached by 1849 with Mount Auburn and Fresh Pond stops, Waltham junction by 1851, B&M 1900, passenger service ended July 9, 1938, 1960 abandonment through Watertown Square, October 5, 2011 abandonment approval for the last 1.72 miles, Phase I School Street–Arlington Street opened 2011, DCR south of Huron Avenue and Cambridge north to Concord Avenue, meeting with the Fresh Pond Trail near the Walter J. Sullivan Water Treatment Facility

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.