South Bay Harbor Trail
Greenway in Massachusetts · OpenStreetMap relation
Runs through Boston · Suffolk County
Conditions now
Loading the weather near Boston…
Forecast by the National Weather Service for Boston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Massachusetts Avenue mile 0 directions to trailhead 1
- Parking at Massachusetts Avenue mile 0.1 directions to trailhead 2
- Parking at Albany Street mile 0.1 directions to trailhead 3
- Parking at Bradston Street mile 0.2 directions to trailhead 4
- Parking at East Newton Street mile 0.3 directions to trailhead 5
- Parking at Frontage Road mile 0.7 directions to trailhead 6
- City of Boston Tow Lot mile 0.8 directions to City of Boston Tow Lot
- Parking at Thayer Street mile 0.9 directions to trailhead 8
- Underground at Ink Block Parking mile 1.1 directions to Underground at Ink Block Parking
- Parking at Traveler Street mile 1.1 directions to trailhead 10
- Parking at Herald Street mile 1.2 directions to trailhead 11
Plan your visit
- By trainAmtrak: Boston, MA (BOS) 0.2 mi from the trail; Amtrak: Boston, MA (BBY) 0.7 mi from a trailhead; Amtrak: Boston, MA (BON) 1.2 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The South Bay Harbor Trail is a mixed-use path in Boston, Massachusetts, that opened in 2011. It starts at Ruggles Station and runs along Melnea Cass Boulevard, crosses Massachusetts Avenue, follows Biosquare Drive near the Massachusetts Avenue Connector and passes under the Southeast Expressway (I-93). It ends at Rolling Bridge Park on Fort Point Channel, where it meets the Boston Harborwalk. Wikipedia describes it as a rail trail.
The project cost about $4.9 million, paid with federal highway funds and a state match, contributions from private property owners the path crosses, and about $1 million raised by the nonprofit Save The Harbor. The trail's designation continues along the Harborwalk to Fan Pier.
The OpenStreetMap record used here covers about 1.45 miles of paved path between Massachusetts Avenue and the Fort Point area, with parking and street access points listed along it. The Wikipedia article gives no overall length and names no manager, and Boston's own trail page could not be fetched.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boston Logan International Airport, 5 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 46 56 66 76 82 80 73 62 52 42 Low °F 23 25 31 41 50 60 66 65 58 48 38 29 Precipitation, in 3.4 3.2 4.2 3.6 3.2 3.9 3.3 3.2 3.6 4 3.7 4.3 Snow, in 14.3 14.4 9 1.6 0 0 0 0 0 0.2 0.7 9 - On the National Register
- Fort Point Channel Historic District, Boston · historic district, listed 2004 · nomination file for Fort Point Channel Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston South sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Nearby trails
- Boston Harborwalk within 0.2 mi · 6.2 mi, paved
- Pierre Lallement Bike Path 0.7 mi away · 4.1 mi, paved
- Dr. Paul Dudley White Path 1.0 mi away · 17.0 mi, paved
- East Boston Greenway 1.3 mi away · 2.2 mi, paved
- Mass Central Rail Trail 1.5 mi away · 70.4 mi, paved
- Jamaicaway Bikepath 2.0 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11497265, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- South Bay Harbor Trail - Wikipedia · organization · checked Oct 17, 2026 Supports: opening year 2011, route, endpoints, cost and funding, mixed-use rail trail
- OpenStreetMap relation 11497265 - South Bay Harbor Trail · web · checked Oct 17, 2026 Supports: mapped length and paved surface of the record
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
