Charles River Greenway
Greenway in Massachusetts
Runs through Waltham, Watertown Town and Newton · Middlesex County
Conditions now
Loading the weather near Waltham…
Forecast by the National Weather Service for Waltham · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Prospect Street mile 0 directions to trailhead 1
- Parking at Prospect Street mile 0 directions to trailhead 2
- Parking at Harvard Street mile 0.2 directions to trailhead 3
- Parking at Felton Street mile 0.5 directions to trailhead 4
- Parking at Felton Street mile 0.5 directions to trailhead 5
- Parking at Moody Street mile 0.5 directions to trailhead 6
- Carter Street Lot mile 0.6 directions to Carter Street Lot
- Parking at Moody Street mile 0.6 directions to trailhead 8
- Parking at Carter Street mile 0.6 directions to trailhead 9
- Parking at Moody Street mile 0.7 directions to trailhead 10
- Parking at Cooper Street mile 0.7 directions to trailhead 11
- Parking at Pine Street mile 0.7 directions to trailhead 12
- Parking at Cooper Street mile 0.7 directions to trailhead 13
- Parking at Moody Street mile 0.7 directions to trailhead 14
- Parking at Elm Street mile 0.7 directions to trailhead 15
- Parking at Cooper Street mile 0.8 directions to trailhead 16
- Parking at Pine Street mile 0.8 directions to trailhead 17
- Parking at Pine Street mile 0.8 directions to trailhead 18
- Parking at Elm Street mile 0.8 directions to trailhead 19
- Parking at Elm Street mile 0.8 directions to trailhead 20
- Parking at River Street mile 0.8 directions to trailhead 21
- Parking at River Avenue mile 0.8 directions to trailhead 22
- Parking at Elm Street mile 0.8 directions to trailhead 23
- Parking at Pine Street mile 0.8 directions to trailhead 24
- Parking at River Street mile 0.8 directions to trailhead 25
- Parking at River Street mile 0.9 directions to trailhead 26
- Parking at River Avenue mile 0.9 directions to trailhead 27
- Parking at River Street mile 0.9 directions to trailhead 28
- Parking at River Street mile 1 directions to trailhead 29
- Parking at Newton Street mile 1.1 directions to trailhead 30
- Parking at Liverpool Lane mile 1.1 directions to trailhead 31
- Parking at Calvary Street mile 1.2 directions to trailhead 32
- Parking at Muldoons Court mile 1.2 directions to trailhead 33
- Parking at Muldoons Court mile 1.3 directions to trailhead 34
- Parking at Muldoons Court mile 1.3 directions to trailhead 35
- Parking at Muldoons Court mile 1.3 directions to trailhead 36
- Parking at River Street mile 1.6 directions to trailhead 37
- Parking at Calvary Street mile 1.6 directions to trailhead 38
- Parking at Farwell Street mile 1.8 directions to trailhead 39
- Parking at Pleasant Street mile 1.9 directions to trailhead 40
- Parking at Pleasant Street mile 2 directions to trailhead 41
- Parking at Pleasant Street mile 2.1 directions to trailhead 42
- Parking at Paramount Place mile 2.4 directions to trailhead 43
(opens in a new tab) About this trail
The Charles River Greenway, also called the Pathway, is a system of paths along both banks of the Charles River in the Upper Charles River Reservation, managed by the Massachusetts Department of Conservation and Recreation (DCR). It runs from Galen Street in Watertown through Newton to Moody Street in Waltham and on to Commonwealth Avenue in Newton and Weston. This record maps about 2.6 miles of it in Waltham, from Prospect Street east past Moody Street toward the Watertown line. It is not a rail trail.
Although the riverbank belonged to the public as part of the Charles River Reservation, almost 100 residential and business encroachments in Watertown, Newton and Waltham, including fences, parking lots and stored materials, blocked access to it. Starting in 1991 the state conservation agency, with park planner Dan Driscoll leading the work, persuaded abutters to remove them and built paths while restoring native vegetation; a section of riverbank on the Waltham side was deliberately left without a path. The greenway opened to the public around 1992 and was completed in 2004, and a link opened in December 2015 closed a gap. In 2024 the Newton Conservators reported that DCR would restore Riverwalk Park in Waltham between Moody Street and Prospect Street, with riverbank stabilization, native plantings, a canoe portage and repairs to the asphalt path.
The paths are about 10 feet wide, of asphalt or stabilized stone dust, with elevated boardwalks where the ground is steep or wet, and overlooks and footbridges across the river. In Waltham the River Walk begins at the Prospect Street bridge, the Gold Star Mothers Bridge, and runs to the Moody Street bridge; from the south end of that bridge a path continues south of the river to North Street in Newton. The state does not plow the paths in winter, which leaves them open for cross-country skiing and snowshoeing.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
51% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bedford Hanscom Field, 12.4 km from the trail's middle, 33 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 48 60 70 79 85 84 76 64 52 42 Low °F 18 19 27 37 47 56 62 60 52 41 32 24 Precipitation, in 2.9 2.7 3.9 3.8 3.4 3.7 3.5 3.5 3.5 4.2 3.7 3.8 - On the National Register
- Newton Street Bridge, Waltham · structure, listed 1989 · nomination file for Newton Street Bridge
- Bemis Mill, Newton · building, listed 1986 · nomination file for Bemis Mill
- American Waltham Watch Company Historic District, Waltham · historic district, listed 1989 · nomination file for American Waltham Watch Company Historic District
- Moody Street Historic District, Waltham · historic district, listed 1990 · nomination file for Moody Street Historic District
- Mount Feake Cemetery, Waltham · site, listed 1989 · nomination file for Mount Feake Cemetery
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Newton sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Mass Central Rail Trail 0.5 mi away · 70.4 mi, paved
- Dr. Paul Dudley White Path 1.1 mi away · 17.0 mi, paved
- Watertown-Cambridge Greenway 1.4 mi away · 2.7 mi, paved
- Fresh Pond Path 2.9 mi away · 2.5 mi, paved
- Alewife Brook Greenway 3.8 mi away · 2.5 mi, paved
- Minuteman Bikeway 3.9 mi away · 10.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The Charles River Greenway at 30 — Newton Conservators Newsletter, Spring 2024 · organization · checked Oct 13, 2026 Supports: name and Pathway, both banks from Galen Street to Moody Street and Commonwealth Avenue, DCR, encroachments and their removal from 1991 under Dan Driscoll, path-free Waltham bank, opened around 1992 and completed 2004, 10-foot asphalt and stone-dust paths, boardwalks, overlooks and footbridges, no winter plowing, planned Riverwalk Park restoration between Moody and Prospect streets
- The Charles River in North Newton, Including Watertown and Waltham — Newton Conservators · organization · checked Oct 13, 2026 Supports: eastern and western sections, December 2015 link closing a gap
- The Charles River, through Waltham, Massachusetts — Waltham Community · web · checked Oct 13, 2026 Supports: River Walk from the Gold Star Mothers Bridge on Prospect Street to the Moody Street bridge, path south of the river from Moody Street to North Street in Newton
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.