States › California

Packwood Creek Trail

Greenway in California

Runs through Visalia · Tulare County

Conditions now

Loading the weather near Visalia…

Forecast by the National Weather Service for Visalia · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Visalia, along the trail (opens in a new tab)
Visalia, along the trail · Photo: Capricorn90 · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Packwood Creek Trail is a path along Packwood Creek in Visalia, Tulare County, California. It belongs to the creek trail network the City of Visalia set out in its Waterways and Trails Master Plan, filed for state environmental review in December 2004, which called for an 86-mile multi-purpose trail system along the city's waterways, among them Mill Creek, Packwood Creek, Cameron Creek and the St. Johns River.

This record maps about 1.9 miles of ways named Packwood Creek Trail in OpenStreetMap. The line runs east from near South Cotta Street and East Walnut Avenue, crosses Lovers Lane, and ends among residential streets near South Rio Vista Street and South Belmont Drive. Most of it is mapped as a path for bicycles and pedestrians; a few short links are sidewalks open to bicycles, and mappers have flagged the line as incomplete.

The city has planned more of the creek trail to the west, toward Mooney Boulevard. A 2009 city filing covered a clear-span bridge over the Packwood Creek channel from the Sequoia Plaza shopping center to Cameron Avenue, with a sidewalk for bicycle and pedestrian use and a connection to a future trail along the south side of the creek. Neither the filings nor OpenStreetMap record the path's surface.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lindsay, 22.4 km from the trail's middle, 30 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576369748391969690796657
Low °F374044475258646257494136
Precipitation, in2.22.221.20.50.10.100.10.71.11.9
Snow, in0.200000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1927 Visalia sheet (1:31,680); the 1950 Visalia sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Visalia Waterways and Trails Master Plan — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026
    Supports: City of Visalia as lead agency, 86-mile multi-purpose trail system along city waterways, Packwood Creek among the waterways with Mill Creek, Cameron Creek and St. Johns River, filed December 2004
  3. Packwood Creek Bridge — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026
    Supports: 2009 City of Visalia filing for a clear-span bridge over the Packwood Creek channel from Sequoia Plaza to Cameron Avenue, sidewalk for bicycle and pedestrian use, connection to a future trail on the south side of the creek, location near Cameron Avenue and South Mooney Boulevard
  4. OpenStreetMap ways named Packwood Creek Trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: mapped extent of about 1.9 miles, nearby streets (South Cotta Street, East Walnut Avenue, Lovers Lane, South Rio Vista Street, South Belmont Drive), cycleway and sidewalk tagging, fixme flags, no surface tag

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.