Santa Fe Trail South
Greenway in California
Runs through Visalia · Tulare County
Conditions now
Loading the weather near Visalia…
Forecast by the National Weather Service for Visalia · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Paradise Avenue mile 2.2 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
Santa Fe Trail South, a name that comes from OpenStreetMap, is the paved Santa Fe Trail in Visalia, Tulare County, California, which runs north-south along the Santa Fe Street corridor from the edge of the city's core to its agricultural fringe. TrailLink, the Rails-to-Trails Conservancy's guide, lists it as 2.5 miles of asphalt between Tulare Avenue at Santa Fe Street and Avenue 272 at Road 128, with lighting and landscaping along its length. It describes the northern half as occupying a former railroad corridor and the southern half as sharing space with a still-active rail line. TrailLink lists no official parking areas.
This record maps about 2.4 miles in six pieces, from the Tulare Avenue end south to Avenue 272. OpenStreetMap shows paved path throughout, three short bridges and signal-controlled and marked street crossings.
South of Avenue 272 the corridor continues toward the city of Tulare. The Tulare County Association of Governments, on behalf of the County of Tulare, proposed the Santa Fe Bike Path/Multipurpose Trail Connection to link Tulare and Visalia: a trail of about 5 miles from Avenue 272 at Santa Fe Street south to Prosperity Avenue at Mooney Boulevard, generally following the historic BNSF railroad right-of-way, partly on an inactive rail corridor and partly beside active track. The county filed its final environmental document for the project in February 2011. TrailLink notes that the Visalia trail is to be extended to meet Tulare's own Santa Fe Trail.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 67% of this route as an out-of-service rail line, naming the line Visalia and Loma Linda Spur.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lindsay, 23.6 km from the trail's middle, 34 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 63 69 74 83 91 96 96 90 79 66 57 Low °F 37 40 44 47 52 58 64 62 57 49 41 36 Precipitation, in 2.2 2.2 2 1.2 0.5 0.1 0.1 0 0.1 0.7 1.1 1.9 Snow, in 0.2 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1927 Visalia sheet (1:31,680); the 1950 Visalia sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Packwood Creek Trail 0.5 mi away · 1.9 mi, surface unknown
- Packwood Trail 0.7 mi away · 1.6 mi, paved
- Santa Fe Trail North 1.5 mi away · 2.3 mi, paved
- Modoc Ditch Trail 2.1 mi away · 2.1 mi, surface unknown
- St John's River Trail 2.2 mi away · 3.2 mi, surface unknown
- Tulare Santa Fe Trail 4.2 mi away · 4.7 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Santa Fe Bike Path/Multi-Purpose Trail Connection Project (Final Document, received 2/25/2011) — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: Tulare County Association of Governments on behalf of the County of Tulare, link between Tulare and Visalia, about 5 miles from Avenue 272 at Santa Fe Street to Prosperity Avenue at Mooney Boulevard, historic BNSF right-of-way, rail-to-trail and rail-with-trail sections, February 2011 final document
- Santa Fe Trail (Visalia) — TrailLink · web · checked Oct 16, 2026 Supports: 2.5-mile asphalt trail, endpoints Tulare Ave. and Santa Fe St. to Ave. 272 and Rd. 128, north-south from the city core to agricultural fringe, northern half on a former railroad corridor and southern half beside an active line, lighting and landscaping, no official parking, planned extension to meet Tulare's Santa Fe Trail
- OpenStreetMap ways named Santa Fe Trail South — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: name, mapped extent of about 2.4 miles in six pieces, paved surface, three bridges, signalized and marked crossings
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.