Panther Parkway Path
Greenway in Florida
Runs through Avon Park · Highlands County
Conditions now
Loading the weather near Avon Park…
Forecast by the National Weather Service for Avon Park · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Panther Parkway Path is a paved path beside Panther Parkway in Highlands County, Florida, on the road between Sebring and Avon Park. The name comes from OpenStreetMap, which maps it as an asphalt cycleway running apart from the roadway; no county or city page found names the path itself. On its Panther Parkway project page, DCCM, the engineering firm the Highlands County Board of County Commissioners hired in January 2017, describes the road as a 4.3-mile segment of Sebring Parkway Phase III between Sebring and Avon Park, which it redesigned, managing $3.2 million in Florida Department of Transportation funding. Construction began in March 2018; the north-end connection to the Memorial Drive roundabout was finished by August 2019 and the south end by the end of 2019.
On the map the path runs about 4.1 miles from its northern end near Memorial Drive and East College Drive southeast to the roundabout where Panther Parkway meets Sebring Parkway. There it continues south as the Sebring Parkway Path. Near the northern end, OpenStreetMap also maps the Memorial Drive Pathway and the West College Drive Multi-Use Pathway.
Highlands County lists road work near the southern end: the northern part of Ben Eastman Road, between Sebring Parkway and Panther Parkway, is closed while the county paves it and adds a sidewalk. The work is expected to continue through mid-December 2026, and Panther Parkway traffic is sent to the roundabout to follow detour signs.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Avon Park 2 W, 7.5 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 73 76 80 85 89 91 92 92 90 86 80 75 Low °F 49 52 55 60 66 71 73 73 72 66 58 53 Precipitation, in 2.4 2 2.6 2.6 3.9 9.2 7.4 7.6 7.5 3.3 2.2 2.1 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1952 Lake Arbuckle SW sheet (1:24,000); the 1956 Fort Pierce sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesOngoing County Road Projects (Highlands County)
Nearby trails
- West College Drive Multi-Use Pathway within 0.2 mi · 1.4 mi, paved
- Sebring Parkway Path within 0.2 mi · 4.7 mi, paved
- Hammock Trail 3.0 mi away · 2.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ongoing County Road Projects — Highlands County, FL · government source · checked Oct 16, 2026 Supports: Ben Eastman Road between Sebring Parkway and Panther Parkway closed for paving and a sidewalk; work expected through mid-December 2026; Panther Parkway traffic directed to the roundabout and detour
- Panther Parkway — DCCM · web · checked Oct 16, 2026 Supports: contract with the Highlands County Board of County Commissioners in January 2017; 4.3-mile segment of Sebring Parkway Phase III between Sebring and Avon Park; DCCM redesign managing $3.2M in FDOT funding; construction began March 2018; Memorial Drive roundabout connection by August 2019; south end finished by year-end 2019
- Way: Panther Parkway Path (1128117779) — OpenStreetMap · web · checked Oct 16, 2026 Supports: name Panther Parkway Path; highway=cycleway with separate sidewalk; asphalt surface; mapped length of about 4.1 miles; northern end near Memorial Drive and East College Drive; southern end at the roundabout with Sebring Parkway, where the Sebring Parkway Path continues; nearby Memorial Drive Pathway and West College Drive Multi-Use Pathway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.