Sebring Parkway Path
Greenway in Florida
Runs through Sebring · Highlands County
Conditions now
Loading the weather near Sebring…
Forecast by the National Weather Service for Sebring · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sebring Parkway mile 3.1 directions to trailhead 1
- Parking at Sebring Parkway mile 3.2 directions to trailhead 2
- Parking at Sebring Parkway mile 3.2 directions to trailhead 3
- Parking at Magnolia Avenue mile 3.2 directions to trailhead 4
- Parking at Sebring Parkway mile 3.2 directions to trailhead 5
Plan your visit
- By trainAmtrak: Sebring, FL (SBG) 0.5 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sebring Parkway Path is a paved path beside Sebring Parkway, a major road through Sebring, in Highlands County, Florida. TrailLink lists it as the Sebring Parkway Trail, a 4-mile concrete greenway open to bicycling and walking and accessible by wheelchair. It is a roadside path, not a rail-trail, and no city, county or state page describing it was found.
TrailLink gives its ends as Sebring Parkway at U.S. 27 and Sebring Parkway at North Ridgewood Drive, and describes it as following the parkway through Sebring past Sebring Lake, Dinner Lake and Lake Jackson. Parking is listed near U.S. 27 at the western end and at other locations in downtown Sebring. A 2016 review on the same site described the path as a sidewalk along a highway.
The record's name comes from OpenStreetMap. Its map line is a single path of about 4.7 miles, longer than TrailLink's figure, running from near Ben Eastman Road at its northwest end to County Road 17A near Medical Center Avenue at its southeast end. OpenStreetMap shows parking beside the path near Magnolia Avenue, about 3.2 miles from the northwest end.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Avon Park 2 W, 13.4 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 73 76 80 85 89 91 92 92 90 86 80 75 Low °F 49 52 55 60 66 71 73 73 72 66 58 53 Precipitation, in 2.4 2 2.6 2.6 3.9 9.2 7.4 7.6 7.5 3.3 2.2 2.1 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Seaboard Air Line Depot, Old--Sebring, Sebring · historic district, listed 1990 · nomination file for Seaboard Air Line Depot, Old--Sebring
- Old maps
USGS topographic maps of the trail's middle go back to the 1952 Lake Arbuckle SW sheet (1:24,000); the 1956 Fort Pierce sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Panther Parkway Path within 0.2 mi · 4.1 mi, paved
- Hammock Trail 2.4 mi away · 2.7 mi, paved
- West College Drive Multi-Use Pathway 4.0 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sebring Parkway Trail — TrailLink · web · checked Oct 16, 2026 Supports: 4 miles, concrete, greenway category, bike, walking and wheelchair use, end points at US 27 and N. Ridgewood Drive, follows Sebring Parkway past Sebring Lake, Dinner Lake and Lake Jackson, parking near US 27 at the western end and in downtown Sebring, 2016 review calling it a sidewalk along a highway
- OpenStreetMap way named Sebring Parkway Path — OpenStreetMap · web · checked Oct 16, 2026 Supports: the name, the record's single map line and its length, nearby parking near Magnolia Avenue; end points and cross streets located by reverse geocoding with OpenStreetMap Nominatim (Ben Eastman Road, CR 17A, Medical Center Avenue)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.