States › Michigan

Paul Henry - Thornapple Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through Kentwood, Gaines Township (Kent County), Caledonia, Middleville, Rutland Township, Hastings, Castleton Township, Nashville and 5 more · Kent, Barry and Eaton counties

All 13 towns and places

Kentwood, Gaines Township (Kent County), Caledonia Township (Kent County), Caledonia, Middleville, Thornapple Township, Irving Township, Rutland Township, Hastings, Hastings Township, Castleton Township, Nashville and Vermontville Township

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Paul Henry–Thornapple Rail Trail is a rail trail that when complete will be 42 miles (68 km) long, running from Grand Rapids to Vermontville, Michigan. The trail closely follows the original route of the Grand River Valley Railroad, constructed in 1868-69 and in operation from 1870 to 1983. The trail is managed by multiple different agencies. The trail has multiple paved sections still to be connected, with a 21⁄2 mile gap between Caledonia and Middleville, a 5-mile gap between Middleville and Hastings, and multiple smaller gaps between Hastings and Nashville. Completed sections of the trail have a 10-foot (3.0 m) wide paved surface with a gravel shoulder. The longest paved section of trail is within Kent county between the trail terminus at Kalamazoo Ave in Kentwood and 108th St in Caledonia Township. The trail has connections with the Frederik Meijer Trail and the East-West Trail, both in Kentwood. A section of the trail from Irving to Middleville is part of the North Country National Scenic Trail.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
31.2 mi 50.2 km1
On former railbed
14.8 mi 47%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East State Street mile 14.5 directions to trailhead 1
  2. Parking at East Clinton Street mile 14.6 directions to trailhead 2
  3. Parking at South Boltwood Street mile 15.4 · restrooms directions to trailhead 3
  4. Parking at South Boltwood Street mile 15.4 · restrooms directions to trailhead 4
  5. Parking at Apple Street mile 15.5 directions to trailhead 5
  6. Parking at North Michigan Avenue mile 15.5 directions to trailhead 6
  7. Parking at East Mill Street mile 15.5 directions to trailhead 7
  8. Parking at East Thorn Street mile 15.5 directions to trailhead 8
  9. Parking at East Mill Street mile 15.5 directions to trailhead 9
  10. Parking at North Michigan Avenue mile 15.5 directions to trailhead 10
  11. Parking at East Mill Street mile 15.5 directions to trailhead 11
  12. Parking at East State Street mile 15.5 directions to trailhead 12
  13. Parking at Apple Street mile 15.5 directions to trailhead 13
  14. Parking at North Jefferson Street mile 15.6 directions to trailhead 14
  15. Parking at West Apple Street mile 15.6 directions to trailhead 15
  16. Parking at West Mill Street mile 15.6 directions to trailhead 16
  17. Parking at West Mill Street mile 15.6 · restrooms directions to trailhead 17
  18. Parking at West Mill Street mile 15.7 directions to trailhead 18
  19. Parking at West Thorn Street mile 15.7 directions to trailhead 19
  20. Parking at West Thorn Street mile 15.7 · restrooms directions to trailhead 20
  21. Parking at West Thorn Street mile 15.7 directions to trailhead 21
  22. Parking at North Church Street mile 15.7 · restrooms directions to trailhead 22
  23. Parking at West Mill Street mile 15.7 directions to trailhead 23
  24. Parking at West Mill Street mile 15.7 · restrooms directions to trailhead 24
  25. Parking at Thorn Street mile 15.8 · restrooms directions to trailhead 25
  26. Parking at West Mill Street mile 15.8 · restrooms directions to trailhead 26
  27. Parking at North Washington Street mile 16.1 directions to trailhead 27
  28. Parking at West Apple Street mile 16.1 directions to trailhead 28
  29. Parking at West Apple Street mile 16.1 directions to trailhead 29
  30. Parking at West Apple Street mile 16.1 directions to trailhead 30
  31. Parking at West Apple Street mile 16.1 directions to trailhead 31
  32. Parking at North Washington Street mile 16.1 directions to trailhead 32
  33. Parking at West Apple Street mile 16.4 directions to trailhead 33
  34. Parking at West State Street mile 16.6 directions to trailhead 34
  35. Parking at Industrial Park Drive mile 16.6 directions to trailhead 35
  36. Parking at McCann Road mile 23.1 directions to trailhead 36
  37. Parking at East Main Street mile 26.7 · restrooms directions to trailhead 37
  38. Parking at Railroad Street mile 26.8 · restrooms directions to trailhead 38
  39. Parking at Crane Road mile 27.7 directions to trailhead 39
  40. Trailhead Parking mile 30.3 directions to Trailhead Parking
  41. Trailhead Parking mile 31 directions to Trailhead Parking
  42. Parking at 100th Street Southeast mile 32.3 directions to trailhead 42
  43. Parking at South Maple Street Southeast mile 32.7 directions to trailhead 43
  44. Parking at Kinsey Street Southeast mile 32.8 directions to trailhead 44
  45. Parking at 60th Street Southeast mile 39.9 directions to trailhead 45
  46. Wing Street Trailhead mile 40.3 directions to Wing Street Trailhead
  47. Parking at 52nd Street Southeast mile 41.5 · restrooms · water directions to trailhead 47
Paul Henry-Thornapple Trail (opens in a new tab)
Paul Henry-Thornapple Trail · Photo: healthiermi · CC BY-SA · Flickr

About this trail

The Paul Henry–Thornapple Trail is a multi-use trail planned to run 42 miles from Grand Rapids to Vermontville, Michigan, through Kent, Barry and Eaton counties; some sections are complete and others are in development or still proposed. It follows the former Grand River Valley Railroad, built in 1868–69, whose first train reached Grand Rapids on January 1, 1870. The line passed to the Michigan Central, the New York Central, Penn Central and Conrail, and from 1979 the Kent-Barry-Eaton Connecting Railway ran it under a state contract until service ended on October 15, 1983. Several local agencies manage the trail, and the all-volunteer Thornapple Trail Association works toward its completion.

The northwest end is on Kalamazoo Avenue just south of 44th Street, on the Kentwood and Grand Rapids line. In Kentwood the trail meets the East-West Trail and, at 60th Street and Wing Avenue, the Frederik Meijer Trail, then passes East Paris Nature Park, crosses M-6 and runs through farmland to Caledonia, where it follows sidewalks and shared lanes through the village, and on to 108th Street at the Barry County line. That is the longest paved section. South of the line the trail is graded dirt to Stimson Road; the corridor from there to Crane Road is private land, and users follow Stimson Road, M-37 and Crane Road across the Thornapple River. The trail resumes along the river through Middleville, crosses it on a converted rail bridge and turns to grass at McCann Road in Irving before ending at Irving Road. It is complete within Hastings; east of there, mostly grass pieces split by private land lead through Nashville, and a paved section from Maple Valley High School crosses the river again to Vermontville.

Completed sections are 10 feet wide, paved, with gravel shoulders. The section from McCann Road to Crane Road is part of the North Country National Scenic Trail, and the stretch south of Middleville closes in November for hunting season. In January 2024 Kentwood received a $300,000 state grant to rebuild 2.8 miles of the trail from 44th Street to East Paris Avenue and 60th Street, with work expected to begin in 2025.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hastings, 10.1 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303444576978828074614735
Low °F161624344555595750393022
Precipitation, in2.62.12.53.84.44.23.43.83.342.92.5
Snow, in21.515.37.22.1000000.35.416.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Hastings sheet (1:62,500); the 1958 Grand Rapids sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Middleville, 1908: Michigan Central Railroad depot
Middleville, 1908: Michigan Central Railroad depotPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

1 Reddit thread about this trail, May 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 283206, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Paul Henry–Thornapple Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7151256, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Paul Henry Thornapple Trail — Village of Middleville, Michigan · government source · checked Oct 14, 2026
    Supports: 42 miles from Grand Rapids to Vermontville when complete, built on or near a former railroad corridor, sections complete, in development or proposed, Thornapple Trail Association contact
  6. About — Thornapple Trails Association · organization · checked Oct 14, 2026
    Supports: all-volunteer association working to complete the trail, planned length and route
  7. Paul Henry–Thornapple Rail Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: Grand River Valley Railroad history (1868–69 construction, January 1, 1870 first train, Michigan Central, New York Central, Penn Central, Conrail, KBEC from 1979, service ended October 15, 1983), managed by multiple agencies, route description and gaps by county, 10-foot paved surface with gravel shoulder, longest paved section Kalamazoo Avenue to 108th Street, East-West Trail and Frederik Meijer Trail connections, North Country Trail section, November hunting closure south of Middleville
  8. Kentwood receives state grant to support trail improvements on the Paul Henry Thornapple Trail — WKTV Journal · organization · checked Oct 14, 2026
    Supports: $300,000 Michigan Natural Resources Trust Fund grant (January 2024) to replace 2.8 miles of asphalt from Kalamazoo Avenue and 44th Street to East Paris Avenue and 60th Street, work expected to begin in 2025

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.