States › Michigan

Plaster Creek Trail

Greenway in Michigan

Runs through Wyoming and Grand Rapids · Kent County

Conditions now

Loading the weather near Grand Rapids…

Forecast by the National Weather Service for Grand Rapids · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Senora Avenue Southeast mile 0 · restrooms directions to trailhead 1
  2. Parking at Senora Avenue Southeast mile 0 · restrooms directions to trailhead 2
  3. Parking mile 3.2 · restrooms directions to trailhead 3
Plaster Creek Trail (opens in a new tab)
Photo: treestryder · CC BY-SA 4.0 · Mapillary

About this trail

The Plaster Creek Trail is a paved path along Plaster Creek in southeast Grand Rapids, Kent County, Michigan. Plaster Creek, named for a large gypsum deposit near its mouth, runs about 26 miles from Dutton Shadyside Park in Gaines Township to the Grand River just south of Wealthy Street in downtown Grand Rapids, and its watershed is considered to contain one of the most polluted creeks in West Michigan. TrailLink lists the trail at 2.7 miles of asphalt; the route mapped here is about 3.1 miles.

The trail was planned in phases. Phase I, 1.2 miles, begins at Ken-O-Sha Park School and follows the creek past interpretive signs. Phase II, about 1.5 miles, starts at Plaster Creek and Eastern Avenue, runs north on the east side of Eastern Avenue, crosses 28th Street and continues west to Division Avenue; it was designed to serve both as a non-motorized trail and as a flood protection and mitigation facility. A third phase was planned from Division Avenue to Oxford Street, toward Millennium Park, with eventual links to Kent Trails and the Paul Henry-Thornapple Rail Trail. In March 2026 the City of Grand Rapids Department of Parks and Recreation was gathering public input for its Southside Creekways project, which is reimagining the Silver Creek and Plaster Creek corridors as a connected system for recreation and mobility.

The trail's east end and trailhead parking are at Ken-O-Sha Park, off Ken-O-Sha Industrial Park Drive. From there it follows the creek west, using city sidewalks along 28th Street SE and Eastern Avenue, to its west end just past the Salvation Army Kroc Center on Division Avenue, near Buchanan Avenue and Centerfield Street. TrailLink lists it for biking, inline skating, walking and cross-country skiing and as wheelchair accessible.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

60% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grand Rapids, 8.9 km from the trail's middle, 36 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444587079838174614736
Low °F192027374958626153423325
Precipitation, in2.52.12.4443.93.93.53.443.12.5
Snow, in22.617.27.62000000.37.120.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Grand Rapids sheet (1:62,500); the 1967 Grand Rapids West sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Help shape the future of Southside Trails at March 11 community event — City of Grand Rapids (March 5, 2026) · government source · checked Oct 15, 2026
    Supports: Department of Parks and Recreation engagement for the Southside Creekways project, reimagining the Silver Creek and Plaster Creek corridors as a connected system, March 2026
  3. Plaster Creek — Wikipedia · organization · checked Oct 15, 2026
    Supports: creek length, source and mouth; name from gypsum deposit; pollution; trail phases I (1.2 miles from Ken-O-Sha Park School, interpretive signs), II (about 1.5 miles, Eastern Avenue, 28th Street to Division Avenue; non-motorized trail and flood mitigation facility) and III (Division Avenue to Oxford Street); planned links to Kent Trails and the Paul Henry-Thornapple Rail Trail
  4. Plaster Creek Trail | Michigan Trails | TrailLink · web · checked Oct 15, 2026
    Supports: 2.7-mile asphalt length; Kent County; end points at Ken-O-Sha Park and Buchanan Ave. & Centerfield St.; route from Ken-O-Sha Park to just past the Kroc Center at Division Avenue; sidewalk sections on 28th Street SE and Eastern Avenue; plans toward the Oxford Street trail and Millennium Park; parking at Ken-O-Sha Park; activities

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.