States › Connecticut

Putnam Bridge Trail Connection

Greenway in Connecticut · OpenStreetMap relation

Runs through Wethersfield, Glastonbury and Glastonbury Center

Conditions now

Loading the weather near Wethersfield…

Forecast by the National Weather Service for Wethersfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Alignment of new segments is approximate pending updated satellite imagery

Length
1.4 mi 2.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Great Meadow Road mile 0.2 directions to trailhead 1
  2. Parking at Naubuc Avenue mile 1.3 directions to trailhead 2
  3. Parking at Naubuc Avenue mile 1.3 directions to trailhead 3
  4. Parking at Naubuc Avenue mile 1.3 directions to trailhead 4
  5. Parking at Naubuc Avenue mile 1.4 directions to trailhead 5
Putnam Bridge Trail Connection drawn on the 1952 USGS topographic map of Hartford South, Connecticut
Then: the 1952 USGS Hartford South sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

About this trail

The Putnam Bridge Trail Connection is a paved shared-use path of about 1.4 miles in Connecticut that gives walkers and cyclists a route across the Connecticut River between Wethersfield and Glastonbury on the Putnam Bridge, which carries Route 3. It is a greenway, not a rail trail. The Connecticut Department of Transportation built it, and the state paid the whole cost of about $8.2 million. Ground was broken in July 2022, with completion then expected in fall 2023. Governor Ned Lamont and Transportation Commissioner Garrett Eucalitto opened the trail at a ceremony in Wethersfield on May 9, 2024.

The trail links the shared-use path on the Putnam Bridge to Great Meadow Road in Wethersfield on the west bank and to Naubuc Avenue in Glastonbury on the east. The project also added sidewalks on both sides of Naubuc Avenue and connections to the Goodwin College trails in East Hartford. OpenStreetMap maps the route as an asphalt path with a metal-decked span on the bridge, and notes that the alignment of its newest segments is approximate.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hartford Brainard Field, 2.3 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374048607180858376645242
Low °F202230405060666456443526
Precipitation, in2.92.63.53.83.43.93.93.544.23.43.8
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Middletown sheet (1:62,500); the 1952 Hartford South sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Putnam Bridge Trail Connection (opens in a new tab)
  1. 360° view 1 of 2, photo by medic1000
  2. 360° view 2 of 2, photo by medic1000
360° panorama · Photo: medic1000 · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17580302, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Connecticut DOT Breaks Ground on Active Transportation Trail — AASHTO Journal (July 22, 2022) · organization · checked Oct 17, 2026
    Supports: groundbreaking July 2022; cost about $8.2 million, 100 percent state funded; completion then expected fall 2023
  3. Glastonbury-Wethersfield Putnam Bridge Trail Connection Opens — Glastonbury Patch (May 9, 2024) · press · checked Oct 17, 2026
    Supports: opening May 9, 2024 at a ceremony in Wethersfield with Gov. Lamont and Commissioner Eucalitto; built by CTDOT and state funded; non-motorized crossing of the Connecticut River; links the Putnam Bridge shared-use path to Great Meadow Road (Wethersfield) and Naubuc Avenue (Glastonbury); sidewalks on both sides of Naubuc Avenue; connection to Goodwin College trails in East Hartford
  4. Putnam Bridge Trail Connection (relation 17580302) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: length about 1.4 miles; asphalt surface; metal-surfaced bridge span on CT 3 (Putnam Bridge) per Nominatim lookup; description that new segment alignment is approximate

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.