Trout Brook Trail
Greenway in Connecticut · OpenStreetMap relation
Runs through West Hartford
Conditions now
Loading the weather near West Hartford…
Forecast by the National Weather Service for West Hartford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Loomis Drive mile 0.8 directions to trailhead 1
- Parking at Loomis Drive mile 0.8 directions to trailhead 2
- Parking at Loomis Drive mile 0.9 directions to trailhead 3
- Parking at Loomis Drive mile 1 directions to trailhead 4
- Parking at Trout Brook Drive mile 1 directions to trailhead 5
- Parking at Trout Brook Drive mile 1.1 directions to trailhead 6
- Parking at Loomis Drive mile 1.1 directions to trailhead 7
- Parking at Farmington Avenue mile 1.2 directions to trailhead 8
- Parking at Farmington Avenue mile 1.2 directions to trailhead 9
- Parking at Farmington Avenue mile 1.2 · restrooms directions to trailhead 10
- Parking at Raymond Road mile 1.2 directions to trailhead 11
- Parking at Farmington Avenue mile 1.2 directions to trailhead 12
- Parking at Farmington Avenue mile 1.2 directions to trailhead 13
- Parking at Farmington Avenue mile 1.2 directions to trailhead 14
- Parking at Trout Brook Drive mile 1.2 directions to trailhead 15
- Parking at Farmington Avenue mile 1.3 · restrooms directions to trailhead 16
- Parking at Raymond Road mile 1.3 · restrooms directions to trailhead 17
- Parking at Farmington Avenue mile 1.3 · restrooms directions to trailhead 18
- Parking at Raymond Road mile 1.3 · restrooms directions to trailhead 19
- Parking at Trout Brook Drive mile 1.3 directions to trailhead 20
- Parking at Memorial Road mile 1.4 · restrooms directions to trailhead 21
- Parking at Memorial Road mile 1.4 · restrooms directions to trailhead 22
- Parking at Trout Brook Drive mile 1.5 directions to trailhead 23
- Parking at Trout Brook Drive mile 1.5 directions to trailhead 24
- Parking at Raymond Road mile 1.5 directions to trailhead 25
- Parking at Trout Brook Drive mile 1.6 directions to trailhead 26
- Parking at Boulevard mile 1.7 directions to trailhead 27
- Parking at Chelton Avenue mile 3.5 directions to trailhead 28
- Parking at New Park Avenue mile 3.6 directions to trailhead 29
- Parking at Chelton Avenue mile 3.6 directions to trailhead 30
- Parking at New Park Avenue mile 3.7 directions to trailhead 31
- Parking at New Park Avenue mile 3.7 directions to trailhead 32
- Parking at New Park Avenue mile 3.7 directions to trailhead 33
- Parking at New Park Avenue mile 3.7 directions to trailhead 34
- Parking at New Park Avenue mile 3.7 directions to trailhead 35
- Parking at New Park Avenue mile 3.7 directions to trailhead 36
- Parking at New Park Avenue mile 3.7 directions to trailhead 37
(opens in a new tab) About this trail
The Trout Brook Trail is a paved greenway in West Hartford, Connecticut, built by the Town of West Hartford for walkers, runners and cyclists. It follows Trout Brook north for almost 4 miles, from New Park Avenue in the Elmwood section to Asylum Avenue; the town describes the path as up to 10 feet wide and complete as initially envisioned, with extensions in design and planning. Phase 3, a 10-foot bituminous path of about three-quarters of a mile from Park Road to Jackson Avenue, received a $500,000 state grant approved by the State Bond Commission in September 2016. Phase 5, from New Park Avenue to Jackson Avenue at Trout Brook Drive, was built between October 2021 and April 2022 on a $690,000 budget, and the Fern Street-to-Asylum Avenue section was slated to open in August 2023.
The trail begins at the New Park Avenue bridge over Trout Brook near the CTfastrak Elmwood station, with parking in the lower lot of the Elmwood Community Center. It continues north past Beachland Park (parking off Quaker Lane South), crosses an I-84 ramp at Clarendon Avenue, and follows Trout Brook Drive past Jackson Avenue, Park Road, Memorial Road, Farmington Avenue and Fern Street (parking at Norfeldt Field on Boulevard) to Asylum Avenue. Marked entrances also include Jackson Avenue and Trout Brook Drive at Farmington Avenue, Fern Street and Duffield Drive.
The path is asphalt and meets ADA standards, and the town committed in 2016 to clearing snow along its full length. Crossings at Quaker Lane South, Park Road and Memorial Road are signalized; the Clarendon Avenue ramp and Jackson Avenue crossings are not. In 2023 the Jackson Avenue-to-Park Road stretch was a narrow sidewalk, with a sidepath on the west side of Trout Brook Drive in design. In October 2024 a guided walk from the Elmwood Community Center to Park Road crossed South Quaker Lane onto the trail's newest section.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hartford Brainard Field, 7.3 km from the trail's middle, 20 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 40 48 60 71 80 85 83 76 64 52 42 Low °F 20 22 30 40 50 60 66 64 56 44 35 26 Precipitation, in 2.9 2.6 3.5 3.8 3.4 3.9 3.9 3.5 4 4.2 3.4 3.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Hartford sheet (1:62,500); the 1952 Hartford North sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
Nearby trails
- CTfastrak Multi-Use Trail 1.3 mi away · 4.5 mi, paved
- Charter Oak Greenway 2.7 mi away · 15.4 mi, paved
- Riverside Park Trail 3.6 mi away · 1.4 mi, paved
- Putnam Bridge Trail Connection 4.5 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3880126, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Walking Trails — Trout Brook Trail — Town of West Hartford · government source · checked Oct 13, 2026 Supports: greenway for walkers, runners and bicyclists; almost 4 miles; up to 10 feet wide; paved; New Park Avenue to Asylum Avenue; complete as initially envisioned with extensions in design and planning; parking at Elmwood Community Center, Beachland Park and Norfeldt Field; marked entrances
- Bye Welcomes State Funding for Trout Brook Trail Phase 3 — Connecticut Senate Democrats (Sept. 30, 2016) · government source · checked Oct 13, 2026 Supports: Phase 3 $500,000 state grant approved by the State Bond Commission, Park Road to Jackson Avenue, about 0.75 mile, 10-foot bituminous path, ADA standards, snow removal along the entire trail
- Trout Brook Trail — Real Hartford (Aug. 29, 2023) · organization · checked Oct 13, 2026 Supports: start at New Park Avenue near CTfastrak and Elmwood station, signalized crossings at Quaker Lane South, Park Road and Memorial Road, unsignalized Clarendon Avenue I-84 ramp and Jackson Avenue crossings, Jackson-to-Park sidewalk with west-side sidepath in design, Fern Street to Asylum Avenue slated to open August 2023
- Take A Hike On West Hartford's Trout Brook Trail — Patch (Oct. 24, 2024) · press · checked Oct 13, 2026 Supports: October 2024 guided walk from the Elmwood Community Center gazebo across South Quaker Lane onto the trail's newest section, ending at Park Road
- Trout Brook Trail, Phase 5 — Giordano Construction · web · checked Oct 13, 2026 Supports: Phase 5 New Park Avenue to Jackson Avenue at Trout Brook Drive, October 2021–April 2022, $690,000 budget
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
