States › Connecticut

CTfastrak Multi-Use Trail

Greenway in Connecticut · OpenStreetMap relation

Runs through Newington, New Britain and Town of New Britain

Conditions now

Loading the weather near Newington…

Forecast by the National Weather Service for Newington · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.5 mi 7.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Willard Avenue mile 0 directions to trailhead 1
  2. Parking at Chapman Street mile 0 directions to trailhead 2
  3. Parking at Willard Avenue mile 0 directions to trailhead 3
  4. Parking at West Hill Road mile 0 directions to trailhead 4
  5. Parking at Willard Avenue mile 0 directions to trailhead 5
  6. Parking at Chapman Street mile 0.1 directions to trailhead 6
  7. Parking at Summit Street mile 0.2 directions to trailhead 7
  8. Parking at Summit Street mile 0.2 directions to trailhead 8
  9. Parking mile 1.5 directions to trailhead 9
  10. Parking at Myra Cohen Way mile 1.7 directions to trailhead 10
  11. Parking at East Street mile 2.3 directions to trailhead 11
  12. Parking at East Street mile 2.3 directions to trailhead 12
  13. Parking at East Street mile 2.3 directions to trailhead 13
  14. Parking at Coccomo Street mile 2.3 directions to trailhead 14
  15. Parking at East Street mile 2.4 directions to trailhead 15
  16. Parking at East Street mile 2.4 directions to trailhead 16
  17. Parking at Recano Road mile 2.4 directions to trailhead 17
  18. Parking at East Street mile 2.4 directions to trailhead 18
  19. Parking at East Street mile 2.4 directions to trailhead 19
  20. Parking at Saint Clair Avenue mile 2.5 directions to trailhead 20
  21. Parking at Saint Clair Avenue mile 2.5 directions to trailhead 21
  22. Parking at Allen Street mile 2.6 directions to trailhead 22
  23. Parking at Saint Clair Avenue mile 2.6 directions to trailhead 23
  24. Parking at Saint Clair Avenue mile 2.6 directions to trailhead 24
  25. Parking at Saint Clair Avenue mile 2.6 directions to trailhead 25
  26. Parking at East Street mile 2.7 directions to trailhead 26
  27. Parking at Dix Avenue mile 2.9 directions to trailhead 27
  28. Parking at Smalley Street mile 3.5 directions to trailhead 28
  29. Parking at Harvard Street mile 3.6 directions to trailhead 29
  30. Parking at Harvard Street mile 3.6 directions to trailhead 30
  31. Parking at East Main Street mile 3.6 directions to trailhead 31
  32. Parking at Harvard Street mile 3.6 directions to trailhead 32
  33. Parking at Florence Street mile 3.6 directions to trailhead 33
  34. Parking at East Main Street mile 3.6 directions to trailhead 34
  35. Parking at East Main Street mile 3.6 directions to trailhead 35
  36. Parking at Wilson Street mile 3.6 directions to trailhead 36
  37. Parking at Yale Street mile 3.7 directions to trailhead 37
  38. Parking at M & S Court mile 3.7 directions to trailhead 38
  39. Parking at M & S Court mile 3.7 directions to trailhead 39
  40. Parking at East Main Street mile 3.7 directions to trailhead 40
  41. Parking at Fairview Street mile 3.8 directions to trailhead 41
  42. Parking at Dwight Street mile 4 directions to trailhead 42
  43. Parking at Stanley Street mile 4 directions to trailhead 43
  44. Parking at Stanley Street mile 4 directions to trailhead 44
  45. Parking at Columbus Boulevard mile 4.2 directions to trailhead 45
  46. Parking at Columbus Boulevard mile 4.2 directions to trailhead 46
  47. Parking at Columbus Boulevard mile 4.3 directions to trailhead 47
  48. Parking at Herald Square mile 4.3 directions to trailhead 48
  49. Parking at Columbus Boulevard mile 4.4 directions to trailhead 49
  50. Parking at Herald Square mile 4.4 directions to trailhead 50
CTfastrak busway, bike route beginning, and Harry Truman Overpass, December 2014 (opens in a new tab)
CTfastrak busway, bike route beginning, and Harry Truman Overpass, December 2014 · Photo: Pi.1415926535 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The CTfastrak Multi-Use Trail is a fenced, paved path for walking and cycling of about 4.5 miles in Hartford County, Connecticut, built alongside the CTfastrak bus rapid transit guideway between the Downtown New Britain and Newington Junction stations. CTfastrak, Connecticut's first bus rapid transit system, runs on a 9.4-mile busway; construction began on May 22, 2012, and the system opened on March 28, 2015. Between Newington Junction and downtown New Britain the busway follows the former Newington Secondary rail line, and the trail shares that corridor. No trail was built north of Newington Junction toward Hartford, where the available room was needed for an Amtrak maintenance access road.

TrailLink lists the trail at 4.4 miles, from Columbus Boulevard in New Britain to West Hill Road in Newington. Between its endpoints the busway has stations at East Main Street, East Street and Cedar Street. Designated trail parking is near the midpoint, at the corner of East and Allen streets in New Britain, with limited parking at some stations. Because an underpass is too narrow for both the busway and the path, users follow the sidewalk along East Street from East Street station, passing under Route 9 and crossing several streets, before the trail returns to the busway and passes St. Mary's Cemetery. All CTtransit and CTfastrak buses carry bicycles.

The path is 10 feet wide, surfaced in asphalt and concrete, and separated from the busway by a fence. It is open from dawn to dusk, and motor vehicles are not allowed. The last mile into downtown New Britain has several at-grade crossings that the buses also use. Plans exist to extend the path from Newington Junction to Hartford along other routes; no current project status was found.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hartford Brainard Field, 10.3 km from the trail's middle, 22 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374048607180858376645242
Low °F202230405060666456443526
Precipitation, in2.92.63.53.83.43.93.93.544.23.43.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Meriden sheet (1:62,500); the 1953 New Britain sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15096236, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Gap Closure Trail Study: Connection to CTfastrak, Public Review Draft — Capitol Region Council of Governments (2019) · government source · checked Oct 13, 2026
    Supports: existing 5-mile CTfastrak multi-use trail beside the bus rapid transit line between the Newington Junction and New Britain CTfastrak stations, all CTfastrak and CTtransit buses equipped with bicycle racks
  3. CTfastrak Celebrates 4 Million Riders Since Opening — Capitol Region Council of Governments · government source · checked Oct 13, 2026
    Supports: CTfastrak completed and service began in March 2015, Connecticut's only bus rapid transit system
  4. CTfastrak — Wikipedia · organization · checked Oct 13, 2026
    Supports: first bus rapid transit system in Connecticut, 9.4-mile busway, groundbreaking May 22, 2012, opening March 28, 2015, busway follows the former Newington Secondary from New Britain to Newington Junction, fenced multi-use trail alongside the busway from New Britain to Newington Junction, no trail north of Newington Junction because of the Amtrak maintenance access road, Cedar Street, East Street and East Main Street stations
  5. CTfastrak Multi-Use Trail — CTMQ (Dec. 6, 2023) · web · checked Oct 13, 2026
    Supports: sidewalk along East Street from East Street station under Route 9 with street crossings, St. Mary's Cemetery, at-grade crossings shared with buses in the last mile
  6. CTfastrak Multi-Use Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 13, 2026
    Supports: 4.4 miles, Columbus Blvd. New Britain to West Hill Rd. Newington, asphalt and concrete, 10 feet wide, fence separation, underpass too narrow so a portion follows East Street, parking at East and Allen streets and limited parking at some stations, open dawn to dusk, no motorized vehicles, plans to extend to Hartford along alternate routes

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.