States › Florida

Tower Road Multi-use Path

Greenway in Florida

Runs through Gainesville · Alachua County

Conditions now

Loading the weather near Gainesville…

Forecast by the National Weather Service for Gainesville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Tower Road Multi-use Path (opens in a new tab)
Photo: pkoby · CC BY-SA 4.0 · Mapillary

About this trail

The Tower Road Multi-Use Path is a 10-foot-wide asphalt path beside Tower Road, also known as SW 75th Street, on the west side of Gainesville in Alachua County, Florida. Alachua County built it under the Florida Department of Transportation's Shared-Use Nonmotorized (SUN) Trail program, which is funded from new vehicle tag fees. The program awarded $950,000; the path cost $536,421 because it was built together with a resurfacing of Tower Road and a new Regional Transit System bus stop. Construction ran from May 2018 to April 2019. FDOT notes that the path links homes along the road with Oak Hall School.

FDOT gives the funded path as 1.2 miles, from 26th Place north to SW 8th Avenue, where it connects to the SW 8th Avenue Multi-Use Path; from the south end, FDOT says, riders can continue east on the Archer Braid Trail to the Kanapaha Botanical Gardens. The line on this page follows OpenStreetMap, which maps about 1.4 miles of path under the name in several pieces, reaching south to near SW 41st Place, unlit, with marked crossings at side streets.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gainesville Regional Airport, 15.6 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F677176828790919088827569
Low °F434650566370727269615145
Precipitation, in3.32.73.52.73.17.66.76.452.71.82.9
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Arredondo sheet (1:62,500); the 1966 Gainesville West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. SUN Trail North Florida — Florida Department of Transportation · government source · checked Oct 17, 2026
    Supports: project listed with construction completion April 2019, fact sheet revised June 2020
  3. SUN Trail Funding Fact Sheet: Tower Road Multi-Use Path — Florida Department of Transportation · web · checked Oct 17, 2026
    Supports: 10-foot asphalt path built by Alachua County beside Tower Road (SW 75th Street); SUN Trail funding from tag fees; $950,000 award, $536,421 cost; built with resurfacing and bus stop; May 2018 to April 2019; Oak Hall School; 1.2 miles from 26th Place to SW 8th Avenue; SW 8th Avenue Multi-Use Path and Archer Braid Trail connections
  4. Tower Road Multi-use Path — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name, mapped pieces and southern extent, asphalt, unlit, marked side-street crossings

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.