States › Iowa

Waveland Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Des Moines · Polk County

Conditions now

Loading the weather near Des Moines…

Forecast by the National Weather Service for Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 56th Street mile 0.9 directions to trailhead 1
  2. Parking at Franklin Avenue mile 2.2 directions to trailhead 2
  3. Parking at Franklin Avenue mile 2.2 directions to trailhead 3
  4. Parking at Franklin Avenue mile 2.2 directions to trailhead 4
The Thomas Stoner House, Des Moines, IA (opens in a new tab)
The Thomas Stoner House, Des Moines, IA · Photo: Jim Roberts · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Waveland Trail is a paved trail of about 2.2 miles on the west side of Des Moines, Iowa, built by the City of Des Moines to connect west-side neighborhoods to the Central Iowa Trail System by way of the Walnut Creek Trail. It is a greenway, not a rail-trail. TrailLink describes it running through the Waveland Park, Waveland Woods and Waterbury neighborhoods, past a community center, a library, a golf course and community gardens.

The city built it in three projects. Phase 1, a 10-foot asphalt trail built in 2009, starts at the Walnut Creek Trail east of 63rd Street and north of Grand Avenue and follows the east side of the Gulf/Cummins Creek greenway northeast, passing under the Pleasant Drive bridge, to 56th Street at the Interstate 235 interchange. Phase 2, awarded to Elder Corporation in 2010 for about $420,000, runs along the west edge of Glendale Cemetery on 55th Street from University Avenue to Franklin Avenue, ending near the Northwest Community Center. Between the two, the route used a 4-foot sidewalk on 56th Street until the city built a 10-foot concrete trail on the east side of 56th Street from I-235 to University Avenue; the council accepted that half-mile link in October 2015 at a cost of $385,551.79, up to $250,000 of it from the Iowa DOT's Transportation Alternatives Program. The city said the finished trail would be a continuous 2.2 miles, which matches the mapped route.

The surface is asphalt on the two outer sections and concrete on the 56th Street link. There is no dedicated trailhead lot; TrailLink points to parking at the Northwest Community Center and the Franklin Avenue Library on Franklin Avenue at the north end. TrailLink's description still mentions a gap between University Avenue and I-235, which the 2015 project closed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 7.9 km from the trail's middle, 17 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SW sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18218609, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Council Communication 09-284: Waveland Trail Phase 1 from the Walnut Creek Trail to 56th Street (May 4, 2009) — City of Des Moines · web · checked Oct 15, 2026
    Supports: purpose (west-side neighborhoods to Central Iowa Trail System), Phase 1 route from Walnut Creek Trail east of 63rd Street to 56th Street at I-235, Pleasant Drive bridge, 10-foot asphalt
  3. Council Communication 10-491: Waveland Trail Phase 2 - University Avenue to Franklin Avenue (August 9, 2010) — City of Des Moines · web · checked Oct 15, 2026
    Supports: Phase 1 built 2009; Phase 2 along west edge of Glendale Cemetery/55th Street, University Avenue to Franklin Avenue near Northwest Community Center; Elder Corporation bid $419,999.99
  4. Council Communication 14-199: Waveland Trail - I-235 to University Avenue (May 5, 2014) — City of Des Moines · web · checked Oct 15, 2026
    Supports: missing half-mile segment on east side of 56th Street, existing 4-foot sidewalk, 10-foot concrete (PCC) trail, continuous 2.2 miles when complete, TAP funding
  5. Resolution accepting completed construction, Waveland Trail - I-235 to University Avenue (October 26, 2015) — City of Des Moines · web · checked Oct 15, 2026
    Supports: October 2015 acceptance, total cost $385,551.79, up to $250,000 Iowa DOT TAP funds
  6. Waveland Trail | Iowa Trails | TrailLink · web · checked Oct 15, 2026
    Supports: neighborhoods and places passed, parking at Northwest Community Center and Franklin Avenue Library, outdated gap description

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.