States › North Carolina

West Ellerbee Creek Trail

Greenway in North Carolina

Runs through Durham · Durham County

Conditions now

Loading the weather near Durham…

Forecast by the National Weather Service for Durham · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Maryland Avenue mile 0.4 directions to trailhead 1
  2. Parking at North Pointe Drive mile 0.7 directions to trailhead 2
  3. Parking at North Pointe Drive mile 0.8 directions to trailhead 3
  4. Parking at North Pointe Drive mile 0.9 directions to trailhead 4
2008-08-02 Ellerbe Creek trail after the rain (opens in a new tab)
2008-08-02 Ellerbe Creek trail after the rain · Photo: Ildar Sagdejev (Specious) · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The West Ellerbee Creek Trail is a greenway in Durham, North Carolina, along West Ellerbee Creek. This record maps about 1.5 miles of the trail, matching the West Ellerbee Creek Trail II extension that opened with a celebration at Westover Park on March 22, 2018. The extension continues the first phase, which ended at Westover Park near Guess Road, to Broad Street at Stadium Drive, linking it to the city's existing trail network.

From Westover Park on Maryland Avenue, where there is parking, the trail crosses Guess Road at a pedestrian signal, passes under Interstate 85 on a boardwalk through an underpass with artwork, crosses North Pointe Drive at a four-way intersection near shopping, and ends at Broad Street. OpenStreetMap shows it mostly asphalt, with concrete stretches, wooden bridges and boardwalks; it also carries the spelling West Ellerbe Creek Trail.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Durham, 4.4 km from the trail's middle, 16 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495261707783878579706052
Low °F283037465564696761483732
Precipitation, in42.94.53.73.85.24.25.24.73.43.63.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Durham North sheet (1:62,500); the 1954 Greensboro sheet (1:250,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Ellerbee Creek Trail II grand opening — WRAL, March 21, 2018 · web · checked Oct 17, 2026
    Supports: 1.5-mile extension, first phase ended at Westover Park near Guess Road, Guess Road pedestrian signal, I-85 underpass artwork, North Pointe Drive intersection and shopping, ends at Broad Street and Stadium Drive, link to existing network, grand opening March 22, 2018 at Westover Park
  3. OpenStreetMap ways named West Ellerbee Creek Trail (e.g. way 43139672) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: mapped length and route, asphalt and concrete, bridges and I-85 boardwalk, Maryland Avenue parking, alt spelling West Ellerbe Creek Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.