Whiskey Island Connector Trail
Greenway in Ohio
Runs through Cleveland · Cuyahoga County
Conditions now
Loading the weather near Cleveland…
Forecast by the National Weather Service for Cleveland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Ed Hauser Way mile 0.3 directions to trailhead 1
- Parking mile 1.3 · restrooms directions to trailhead 2
(opens in a new tab) About this trail
The Whiskey Island Connector Trail is an all-purpose trail in Cleveland, Ohio, linking Edgewater Park with Wendy Park on Whiskey Island. Cleveland Metroparks manages it in its Lakefront Reservation and describes it as completing a missing link between the two parks. Metroparks opened it on June 24, 2021, together with the Wendy Park Bridge. Its release gives the cost as $3.6 million and names E.L. Robinson Engineering Co. as designer and Mark Haynes Construction as builder. The trail was one of the final two pieces of the Re-Connecting Cleveland project, which the release lists at $16.45 million, including a $7.95 million federal TIGER grant. Before the trail, walkers, joggers and cyclists traveling between Edgewater Park, Whiskey Island and Wendy Park shared a narrow stretch of roadway with blind turns, cars, buses, trucks and boat trailers.
Metroparks gives the trail as 1.2 miles (1.9 km) long, and Ideastream Public Media described it as 1.25 miles; the mapped line in this record covers about 1.4 miles (2.3 km) in two pieces. The trail provides an off-road connection with views of the active Port of Cleveland Bulk Terminal and several interpretive spaces about the history of the lakefront. Metroparks lists parking as an amenity and lists the Wendy Park Bridge, a 500-foot span over railroad tracks that it says provides a new link between downtown Cleveland and the Metroparks lakefront parks, among the nearby features. OpenStreetMap maps the line as asphalt, with a concrete bridge section, tagged as a cycleway.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cleveland Burke Airport, 4.1 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 37 45 57 68 77 81 80 74 62 50 40 Low °F 24 24 31 41 53 63 68 67 60 49 38 30 Precipitation, in 1.8 1.5 2.4 3.1 3.5 2.8 3.7 3.5 2.9 3.2 2.9 2 - On the National Register
- Pennsylvania Railway Ore Dock, Cleveland · historic district, listed 1997 · nomination file for Pennsylvania Railway Ore Dock
- Old maps
USGS topographic maps of the trail's middle go back to the 1903 Cleveland sheet (1:62,500); the 1953 Cleveland South sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesWhiskey Island Trail — Cleveland Metroparks
Nearby trails
- Cleveland Lakefront Bikeway within 0.2 mi · 5.8 mi, paved
- Cleveland Foundation Centennial Trail 0.3 mi away · 0.8 mi, paved
- Ohio & Erie Canal Towpath Trail 0.6 mi away · 85.4 mi, paved
- Red Line Greenway 1.0 mi away · 1.9 mi, paved
- Brookside Reservation All Purpose Trail 2.8 mi away · 2.9 mi, paved
- Opportunity Corridor Trail 3.5 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Cleveland Metroparks Opens Wendy Park Bridge to Pedestrians and Cyclists — Ideastream Public Media · organization · checked Oct 31, 2026 Supports: describes the Whiskey Island Connector as a 1.25-mile trail connecting Wendy Park to Edgewater Park
- Whiskey Island Trail — Cleveland Metroparks · web · checked Oct 31, 2026 Supports: managed by Cleveland Metroparks within the Lakefront Reservation; 1.2 miles of all-purpose trail; completes a missing link between Edgewater Park and Wendy Park on Whiskey Island; off-road connection with views of the active Port of Cleveland Bulk Terminal; several interpretive spaces on the history of the lakefront; parking listed as an amenity; Wendy Park Bridge listed as a nearby feature (500 feet over Norfolk-Southern railroad tracks, a new link between downtown Cleveland and Cleveland Metroparks lakefront parks); surface material not stated
- Cleveland Metroparks Opens Wendy Park Bridge and Whiskey Island Trail — Cleveland Metroparks · web · checked Oct 31, 2026 Supports: opened June 24, 2021 together with the Wendy Park Bridge; trail described as 1.2 miles of all-purpose trail running between Edgewater Park and Wendy Park; $3.6 million cost; designed by E.L. Robinson Engineering Co. and built by Mark Haynes Construction (as the Whiskey Island Connector Trail); the bridge and trail are the two final pieces of the $16.45 million Re-Connecting Cleveland TIGER project; $7.95 million TIGER grant; earlier, walkers, joggers and cyclists shared a narrow stretch of roadway with blind turns, cars, buses, trucks and boat trailers
- Whiskey Island Connector Trail — OpenStreetMap way 957003778 · web · checked Oct 31, 2026 Supports: named Whiskey Island Connector Trail; highway=cycleway, foot=designated; surface=asphalt (a neighbouring way, 957360017, named the same, is bridge=yes with surface=concrete)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.