Red Line Greenway

Greenway in Ohio · OpenStreetMap relation

Runs through Cleveland · Cuyahoga County

Conditions now

Loading the weather near Cleveland…

Forecast by the National Weather Service for Cleveland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West 53rd Street mile 0 directions to trailhead 1
  2. Parking at West 52nd Street mile 0.1 directions to trailhead 2
  3. Parking at Columbus Road mile 1.3 directions to trailhead 3
  4. Parking at Willey Avenue mile 1.4 directions to trailhead 4
  5. Parking at Gehring Avenue mile 1.4 directions to trailhead 5
  6. Parking at West 21st Place mile 1.5 directions to trailhead 6
  7. Parking at Abbey Avenue mile 1.5 directions to trailhead 7
  8. Parking at Gehring Avenue mile 1.5 directions to trailhead 8
  9. Parking at Gehring Avenue mile 1.5 directions to trailhead 9
  10. Parking at Gehring Avenue mile 1.5 directions to trailhead 10
  11. West Side Market Parking mile 1.6 directions to West Side Market Parking
  12. Parking at West 20th Street mile 1.6 directions to trailhead 12
  13. Parking at Columbus Road mile 1.7 directions to trailhead 13
  14. Parking at Riverbed Street mile 1.8 directions to trailhead 14
  15. Parking at Columbus Road mile 1.9 directions to trailhead 15

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Red Line Greenway (opens in a new tab)
Photo: skorasaurus · CC BY-SA 4.0 · Mapillary

About this trail

The Red Line Greenway is a paved, accessible all-purpose trail of nearly 2 miles in Cleveland, Ohio, built by Cleveland Metroparks on former Greater Cleveland Regional Transit Authority right-of-way beside the RTA Red Line rapid transit tracks. The idea dates to the 1970s, when an RTA passenger riding in from the airport suggested a trail would make a better first impression than the debris along the line; the Rotary Club of Cleveland took up the idea and helped maintain the corridor for four decades. Construction began in late 2019, and the trail opened on May 12, 2021, with a ribbon cutting at the Columbus Road access point.

The trail runs from Michael Zone Recreation Center Park at West 53rd Street to the Cleveland Foundation Centennial Lake Link Trail at Franklin Avenue and Columbus Road, passing through eight neighborhoods and linking two Red Line stations. Other access points are at West 44th Street, West 41st Street, West 25th Street and Columbus Road near Abbey Avenue and Franklin Avenue. It is one of five pieces of the Re-Connecting Cleveland project, with the Whiskey Island Connector Trail, the Wendy Park Bridge, the Canal Basin Park Connector and the Cleveland Lakefront Bikeway Connector, which together add more than 4 miles of trail. About 1.9 miles are mapped here.

The greenway has pull-off areas for picnicking and rest, and native trees and landscaping along its length. Michael Baker International designed it and Mark Haynes Construction built it. Construction cost about $6 million, paid with part of a $7.95 million federal TIGER grant awarded to Re-Connecting Cleveland in 2016, more than $2 million in federal Congestion Mitigation and Air Quality funds, $680,000 from the Trust for Public Land and $500,000 from the Ohio Department of Natural Resources Clean Ohio Trails Fund.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cleveland Burke Airport, 4.8 km from the trail's middle, 17 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353745576877818074625040
Low °F242431415363686760493830
Precipitation, in1.81.52.43.13.52.83.73.52.93.22.92
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Cleveland sheet (1:62,500); the 1953 Cleveland South sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19568311, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Cleveland Metroparks and Partners Announce the Opening of Red Line Greenway — Cleveland Metroparks (May 2021) · web · checked Oct 14, 2026
    Supports: accessible trail; ribbon cutting at the Columbus Road access point; route from Michael Zone Recreation Center Park at West 53rd Street to the Centennial Lake Link Trail at Franklin Avenue and Columbus Road; eight neighborhoods; access points; former RTA right-of-way along the Red Line; pull-off areas, native trees and landscaping; two Red Line stations; Rotary Club of Cleveland maintained the area for four decades; Re-Connecting Cleveland's five projects and more than 4 miles of trail; $7.95 million TIGER grant in 2016; about $6 million construction cost, over $2 million CMAQ, $680,000 from TPL, $500,000 from the ODNR Clean Ohio Trails Fund
  3. Connected: Red Line Greenway opens, linking a two-mile trail to downtown Cleveland — FreshWater Cleveland (May 13, 2021) · web · checked Oct 14, 2026
    Supports: opened Wednesday, May 12 (2021); nearly two-mile paved all-purpose trail; construction began late 2019; 1970s origin with an RTA passenger from the airport and the Rotary Club of Cleveland; designed by Michael Baker International and built by Mark Haynes Construction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.