States › Indiana

Coal Line Trail

Rail-trail in Indiana · OpenStreetMap relation

Runs through South Bend · St. Joseph County

Conditions now

Loading the weather near South Bend…

Forecast by the National Weather Service for South Bend · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Wilber Street mile 0 directions to trailhead 1
  2. Parking at Lincolnway West mile 0 directions to trailhead 2
  3. Parking at Rupel Street mile 0 directions to trailhead 3
  4. Parking at Sancome Avenue mile 0 directions to trailhead 4
  5. Parking at Rupel Street mile 0 directions to trailhead 5
  6. Parking at Wilber Street mile 0 directions to trailhead 6
  7. Parking at Wilber Street mile 0.1 directions to trailhead 7
  8. Parking at Vassar Avenue mile 0.2 directions to trailhead 8
  9. Parking at Wilber Street mile 0.2 directions to trailhead 9
  10. Parking at Diamond Avenue mile 0.5 directions to trailhead 10
  11. Parking at Portage Avenue mile 0.6 directions to trailhead 11
  12. Parking at King Street mile 0.6 directions to trailhead 12
  13. Parking at West Angela Boulevard mile 0.8 directions to trailhead 13
  14. Parking at West North Shore Drive mile 1.1 directions to trailhead 14
  15. Parking at Marigold Way mile 1.1 directions to trailhead 15
  16. Parking at West Angela Boulevard mile 1.4 directions to trailhead 16
  17. Parking at West Angela Boulevard mile 1.5 directions to trailhead 17
  18. Parking at West Angela Boulevard mile 1.5 directions to trailhead 18
  19. Parking at West Angela Boulevard mile 1.5 directions to trailhead 19
  20. Parking at West Pokagon Street mile 1.6 directions to trailhead 20

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Muessel-Drewry Brewery, beside the trail (opens in a new tab)
Muessel-Drewry Brewery, beside the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Coal Line Trail, which the City of South Bend renamed the Stephen J. Luecke Coal Line Trail after the city's former mayor, is a paved rail-trail on the near northwest side of South Bend, Indiana. It follows a former railroad that carried coal to the University of Notre Dame's power plant; WNDU reported in 2022 that the line had been out of service for about 30 years. The city's Department of Community Investment and South Bend Venues Parks and Arts led the project, which planners said grew out of a plan for the west side of the city.

The first phase, from Lincolnway West to Angela Boulevard, opened in November 2022. Construction of the second phase began June 8, 2023: it converted the old railroad bridge over the St. Joseph River, built in 1926, into a pedestrian bridge and carried the trail east along the former right-of-way behind houses on the north side of Angela Boulevard to State Road 933 (Michigan Street). A ribbon cutting for the completed second phase was held in March 2024. ABC57 reported that the $7 million phase was paid 80 percent from federal Congestion Mitigation and Air Quality funds and 20 percent by the city. A future phase is to continue the trail south of Lincolnway West to the Martin Luther King Jr. Dream Center on Linden Avenue.

The trail is a 12-foot-wide concrete path. Near its southwest end it passes Muessel Grove Park, where a trailhead has benches, a drinking fountain and a bicycle repair station, and parking is available at Brownfield Park on Angela Boulevard. It meets the Riverside Trail at Riverside Drive and, east of the river, the East Bank Trail near Michigan Street. The mapped route covers about 1.5 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 81% of this route as an abandoned rail line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
South Bend Michiana Regional Airport, 4.5 km from the trail's middle, 28 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313546597079838174624836
Low °F171927374858626053423223
Precipitation, in2.72.32.43.54.243.843.53.72.82.4
Snow, in21.616.16.81000000.25.113.7
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Chicago sheet (1:250,000); the 1958 South Bend West sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 16398447, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Construction Set to Begin on Next Phase of Coal Line Trail — South Bend, Indiana · government source · checked Oct 15, 2026
    Supports: Stephen J. Luecke name, phase 1 Lincolnway West to Angela Boulevard opened November 2022, phase 2 construction start June 8 2023, route behind houses north of Angela Boulevard to State Road 933, bridge conversion, future phase to the MLK Dream Center on Linden Avenue
  3. Coal Line Trail set to bridge the gap in South Bend — WNDU (Sept. 14, 2022) · web · checked Oct 15, 2026
    Supports: line out of service 30 years, Community Investment and Venues Parks and Arts leading the project, west side plan, 1926 railroad bridge
  4. Second phase of Coal Line Trail project completed — WNDU (March 21, 2024) · web · checked Oct 15, 2026
    Supports: March 2024 ribbon cutting, named for former Mayor Steve Luecke, phase 2 to State Road 933
  5. Coal Line Trail connects more of South Bend — ABC57 (March 21, 2024) · web · checked Oct 15, 2026
    Supports: $7 million phase two, 80 percent federal CMAQ funds and 20 percent city, trail from Lincolnway to Michigan Street, phase three
  6. Brand new bike trail to replace old railway across Michiana — ABC57 · web · checked Oct 15, 2026
    Supports: line delivered coal to the Notre Dame power plant
  7. Coal Line Trail | Indiana Trails | TrailLink · web · checked Oct 15, 2026
    Supports: 12-foot-wide concrete surface, Muessel Grove Park trailhead amenities, Brownfield Park parking, Riverside Trail and East Bank Trail connections

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.