Link Trail
Greenway in Indiana
Runs through South Bend · St. Joseph County
Conditions now
Loading the weather near South Bend…
Forecast by the National Weather Service for South Bend · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Napoleon Street mile 0.1 directions to trailhead 1
- Parking at Campeau Street mile 0.4 directions to trailhead 2
- Parking at North Frances Street mile 0.4 directions to trailhead 3
- Parking at Corby Boulevard mile 0.4 directions to trailhead 4
- Parking at Campeau Street mile 0.5 directions to trailhead 5
- Parking at Cedar Street mile 0.8 directions to trailhead 6
- Parking at North Saint Louis Boulevard mile 0.8 directions to trailhead 7
- Parking at North Niles Avenue mile 0.8 directions to trailhead 8
- Parking at North Hill Street mile 0.9 directions to trailhead 9
- Parking at Cedar Street mile 0.9 directions to trailhead 10
- Parking at East Madison Street mile 1 directions to trailhead 11
- Parking at East Madison Street mile 1 directions to trailhead 12
- Parking at North Hill Street mile 1 directions to trailhead 13
- Parking at North Hill Street mile 1.1 directions to trailhead 14
- Parking at North Niles Avenue mile 1.1 directions to trailhead 15
- Parking at Church Place mile 1.1 directions to trailhead 16
- Parking at East Colfax Avenue mile 1.1 directions to trailhead 17
- Parking at East LaSalle Avenue mile 1.1 directions to trailhead 18
- Parking at East LaSalle Avenue mile 1.2 directions to trailhead 19
- Parking at East LaSalle Avenue mile 1.2 directions to trailhead 20
- Parking at East LaSalle Avenue mile 1.2 directions to trailhead 21
- Parking at North Niles Avenue mile 1.2 directions to trailhead 22
- Parking at East LaSalle Avenue mile 1.3 directions to trailhead 23
- Parking at East LaSalle Avenue mile 1.3 directions to trailhead 24
- Parking at East LaSalle Avenue mile 1.3 directions to trailhead 25
(opens in a new tab) About this trail
The Link Trail is a 1.5-mile walking and bicycling route between downtown South Bend, Indiana, and the University of Notre Dame. The City of South Bend, the Hotel-Motel Tax Board through Visit South Bend Mishawaka, and the university paid for it jointly. Construction began in May 2024, and the city announced the trail open on November 7, 2024, with a ribbon-cutting planned for spring 2025.
The route starts at the plaza at LaSalle Avenue and Dr. Martin Luther King Jr. Boulevard and runs east on LaSalle Avenue through East Bank Village, then north on Hill Street and northeast on South Bend Avenue to Notre Dame Avenue. It ends at Angela Boulevard and Notre Dame Avenue, where users can enter campus or join the multi-use path along Angela Boulevard.
The trail is built beside city streets rather than on a rail corridor. The city's project page lists a two-way cycletrack and shared-use trail with raised crossings on the east side of Notre Dame Avenue, a shared-use trail on the north side of South Bend Avenue, and one on the west side of Hill Street. The line on this page, from OpenStreetMap, covers about 1.3 miles of the route.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
South Bend Michiana Regional Airport, 6.8 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 35 46 59 70 79 83 81 74 62 48 36 Low °F 17 19 27 37 48 58 62 60 53 42 32 23 Precipitation, in 2.7 2.3 2.4 3.5 4.2 4 3.8 4 3.5 3.7 2.8 2.4 Snow, in 21.6 16.1 6.8 1 0 0 0 0 0 0.2 5.1 13.7 - On the National Register
- La Salle Street Bridge, South Bend · structure, listed 1999 · nomination file for La Salle Street Bridge
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Chicago sheet (1:250,000); the 1958 South Bend East sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesLink Trail project page (City of South Bend)
Look around
Nearby trails
- Notre Dame Bikeway within 0.2 mi · 1.6 mi, paved
- East Bank Trail within 0.2 mi · 1.5 mi, paved
- Riverwalk/Northside Trail 0.2 mi away · 3.4 mi, paved
- Indiana-Michigan River Valley Trail 0.4 mi away · 12.8 mi, paved · Michigan
- Coal Line Trail 0.7 mi away · 1.7 mi, paved
- Riverside Trail 1.1 mi away · 3.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Link Trail Connects Downtown South Bend to Notre Dame — City of South Bend · government source · checked Oct 18, 2026 Supports: 1.5 miles, route, end point at Angela Boulevard, joint funding, opening announced November 7, 2024, ribbon-cutting planned for spring 2025
- Notre Dame Avenue - South Bend Avenue - Hill Street Streetscape Improvements / Link Trail — Together South Bend (City of South Bend) · government source · checked Oct 18, 2026 Supports: cycletrack and shared-use trail on each street, raised crossings, construction began May 2024
- The Link Trail — Visit South Bend Mishawaka · web · checked Oct 18, 2026 Supports: East Bank Village, plaza start at LaSalle Avenue and Dr. Martin Luther King Jr. Boulevard
- OpenStreetMap — OpenStreetMap contributors · web · checked Oct 18, 2026 Supports: mapped route, length and surface, trailhead streets, path names where stated
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
