States › Indiana

East Bank Trail

Rail-trail in Indiana · OpenStreetMap relation

Runs through South Bend · St. Joseph County

Conditions now

Loading the weather near South Bend…

Forecast by the National Weather Service for South Bend · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.3 km1
On former railbed
0.6 mi 40%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Pokagon Street mile 0 directions to trailhead 1
  2. Parking at Otsego Street mile 0 directions to trailhead 2
  3. Parking at North Michigan Street mile 0.1 directions to trailhead 3
  4. Parking at North Niles Avenue mile 0.7 directions to trailhead 4
  5. Parking at Crescent Avenue mile 0.8 directions to trailhead 5
  6. Parking at Crescent Avenue mile 0.8 directions to trailhead 6
  7. Parking at North Niles Avenue mile 0.8 directions to trailhead 7
  8. Parking at East Madison Street mile 0.9 directions to trailhead 8
  9. Parking at Crescent Avenue mile 0.9 directions to trailhead 9
  10. Parking at East Madison Street mile 1 directions to trailhead 10
  11. Parking at East Madison Street mile 1.1 directions to trailhead 11
  12. Parking at North Niles Avenue mile 1.2 directions to trailhead 12
  13. Parking at East Colfax Avenue mile 1.3 directions to trailhead 13
  14. Parking at North Niles Avenue mile 1.3 directions to trailhead 14
  15. Parking at North Niles Avenue mile 1.4 directions to trailhead 15
  16. Parking at North Niles Avenue mile 1.4 directions to trailhead 16
  17. Parking at Gintz Avenue mile 1.4 directions to trailhead 17
South Bend, along the trail (opens in a new tab)
South Bend, along the trail · Photo: Khoa Huynh · CC BY-SA 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The East Bank Trail is a paved city trail along the east bank of the St. Joseph River in South Bend, Indiana. The City of South Bend Public Works Department posts its repairs and closures. TrailLink lists it as one of the named sections of the Indiana Michigan River Valley Trail, a system of about 17 miles of paved trails linking Niles, Michigan, with Mishawaka, Indiana, and classes it as a rail-trail.

TrailLink gives the length as 1.7 miles, from Angela Boulevard just west of Michigan Street (State Road 933) to Howard Park at Jefferson Boulevard. The northern part is asphalt through tree-lined neighborhoods near St. Joseph High School and the edges of the Holy Cross College and University of Notre Dame campuses. At Howard Street and North Shore Drive a newer concrete section continues south along the river through the East Bank Village, and a crossing over the South Bend Dam leads to Seitz Park beside the East Race Waterway. The trail meets the Coal Line Trail at its north end and connects with the Northside Trail toward Mishawaka. The record maps about 1.5 miles, from the Coal Line junction south to the East Race area.

In the fall of 2024 the city closed the trail over the Leeper Avenue bridge to replace the bridge decking with concrete and add new fencing. In June 2026 the city began replacing the wooden boardwalk between Seitz Park and Howard Park with a 14-foot-wide concrete walk, along with replacing the bridge over the East Race Waterway; portions of the trail near Seitz Park are closed during the work, which is to run through May 2027. A new path on Madison Street is to connect the East Bank Trail with The Link Trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
South Bend Michiana Regional Airport, 6.3 km from the trail's middle, 24 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313546597079838174624836
Low °F171927374858626053423223
Precipitation, in2.72.32.43.54.243.843.53.72.82.4
Snow, in21.616.16.81000000.25.113.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Chicago sheet (1:250,000); the 1958 South Bend East sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 16261997, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City Announces Trail Improvements and Street Closures — South Bend, Indiana (June 2, 2026) · government source · checked Oct 15, 2026
    Supports: boardwalk replacement between Seitz Park and Howard Park, East Race bridge, closures near Seitz Park through May 2027, Madison Street path connecting East Bank Trail to The Link Trail
  3. East Bank Trail Repairs to Begin Wednesday, October 2 — South Bend, Indiana (Sept. 27, 2024) · government source · checked Oct 15, 2026
    Supports: Public Works repairs over the Leeper Avenue bridge: concrete decking, new fencing, closure in fall 2024
  4. East Bank Trail | Indiana Trails | TrailLink · web · checked Oct 15, 2026
    Supports: section of the Indiana Michigan River Valley Trail (about 17 miles, Niles to Mishawaka), rail-trail category, 1.7 miles, endpoints, asphalt northern part near St. Joseph High School, Holy Cross and Notre Dame, concrete section from Howard Street/North Shore Drive, East Bank Village, South Bend Dam crossing to Seitz Park and the East Race, Northside Trail connection
  5. Coal Line Trail | Indiana Trails | TrailLink · web · checked Oct 15, 2026
    Supports: connection with the Coal Line Trail
  6. East Bank Trail (relation 16261997) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped extent and length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.