Neponset River Greenway
Greenway in Massachusetts · OpenStreetMap relation
Runs through Boston and Milton · Suffolk and Norfolk counties
Conditions now
Loading the weather near Boston…
Forecast by the National Weather Service for Boston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Victory Road Park Parking Lot mile 0.3 directions to Victory Road Park Parking Lot
- Parking at Conley Street mile 0.9 · water directions to trailhead 2
- Parking at Conley Street mile 0.9 · water directions to trailhead 3
- Parking at Neponset Avenue mile 1.7 · restrooms · water directions to trailhead 4
- Parking mile 1.8 · restrooms · water directions to trailhead 5
- Parking at Clover Street mile 1.9 directions to trailhead 6
- Parking at Hallet Street mile 2.1 directions to trailhead 7
- Parking at Hill Top Street mile 2.4 · restrooms · water directions to trailhead 8
- Parking at Short Road mile 2.5 · water directions to trailhead 9
- Parking at Branchfield Street mile 3.2 directions to trailhead 10
- MBTA Lot mile 3.4 directions to MBTA Lot
- Town Parking mile 3.4 directions to Town Parking
- Parking at Eliot Street mile 3.7 directions to trailhead 13
- Parking at River Street mile 4.5 · restrooms · water directions to trailhead 14
- Parking at Truman Parkway mile 7.5 directions to trailhead 15
- Parking at Truman Parkway mile 7.7 directions to trailhead 16
- Parking at Truman Parkway mile 7.7 directions to trailhead 17
(opens in a new tab) About this trail
The Neponset River Greenway is a paved shared-use trail of about 9 miles along the Neponset River, Boston's southern border, running through the Readville, Hyde Park, Mattapan and Dorchester neighborhoods and into Milton. The Massachusetts Department of Conservation and Recreation (DCR) owns much of the shoreline as the Neponset River Reservation and has built the trail with the Massachusetts Department of Transportation; the Neponset River Greenway Council and the Neponset River Watershed Association advocate for it. The founders of the Metropolitan Park System envisioned the greenway in the late 19th century, and official efforts began in 1996. The first section, from Pope John Paul II Park to Central Avenue in Milton, was completed in 2002, partly on a former railroad right-of-way where contaminated soil was removed before construction.
From its northern end at Morrissey Boulevard the trail follows Tenean Beach and Port Norfolk Park, crosses Pope John Paul II Park and a salt marsh, and runs beside the Mattapan high-speed trolley line to Central Avenue. The Harvest River Bridge carries it on to Mattapan Square, and the Neponset River Esplanade continues between Truman Parkway and the river past the Martini Shell in Hyde Park to Neponset Valley Parkway in Readville. The Tenean Beach extension opened in 2010, the Esplanade in 2012, the Port Norfolk and Readville sections in 2015, and the Central Avenue to Mattapan Square section in 2018.
The newest section, a 0.9-mile extension from Tenean Beach to Morrissey Boulevard, opened on April 29, 2026. It has a 10-foot paved surface, a crosswalk at Victory Road, a 670-foot elevated boardwalk over the tidal salt marsh of Dorchester Bay and an overlook deck. Proposed further links include a path beside Neponset Valley Parkway to the Fowl Meadow section of the Blue Hills Reservation and a connection from Morrissey Boulevard to Columbia Point.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boston Logan International Airport, 11.5 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 46 56 66 76 82 80 73 62 52 42 Low °F 23 25 31 41 50 60 66 65 58 48 38 29 Precipitation, in 3.4 3.2 4.2 3.6 3.2 3.9 3.3 3.2 3.6 4 3.7 4.3 Snow, in 14.3 14.4 9 1.6 0 0 0 0 0 0.2 0.7 9 - On the National Register
- Dorchester--Milton Lower Mills Industrial District (Boundary Increase), Boston · historic district, listed 2001 · nomination file for Dorchester--Milton Lower Mills Industrial District (Boundary Increase)
- Dorchester-Milton Lower Mills Industrial District, Boston · historic district, listed 1980 · nomination file for Dorchester-Milton Lower Mills Industrial District
- Truman Parkway--Metropolitan Park System of Greater Boston, Boston · historic district, listed 2005 · nomination file for Truman Parkway--Metropolitan Park System of Greater Boston
- Blue Hills Parkway, Boston Milton · historic district, listed 2003 · nomination file for Blue Hills Parkway
- Neponset Valley Parkway, Metorpolitan Park System of Greater Boston, Boston · historic district, listed 2005 · nomination file for Neponset Valley Parkway, Metorpolitan Park System of Greater Boston
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston South sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- One rider in January 2025 reported the bridge near Mattapan and most of the path still iced or snow-packed after a snowfall; commenters said DCR trails are rarely cleared and recommended studded tires. r/bikeboston, Jan 2025
- Riders in 2025 and 2026 described the sidewalk beyond the extension's end at the Morrissey Boulevard drawbridge, toward the UMass Boston Harborwalk, as narrow and bumpy, with a tight gap near bridge equipment. r/bikeboston, Jul 2025 · r/bikeboston, Jul 2025 · r/bikeboston, Oct 2025 · r/bikeboston, Mar 2026
- Riders in 2025 and 2026 described riding between Hyde Park or Mattapan and Castle Island by way of the Tenean Beach extension and Harborwalk, with a flashing-light crosswalk at Victory Road. r/bikeboston, Jul 2025 · r/bikeboston, Mar 2026 · r/bikeboston, Mar 2026
- Riders suggesting low-crossing routes in 2025 and 2026 said this trail has only a couple of road crossings, one adding that the Pope John Paul II Park to Mattapan stretch was not crowded. r/bikeboston, Jun 2025 · r/bikeboston, May 2026
14 Reddit threads about this trail, Jan 2025 to May 2026
- Great day to be out r/bikeboston · Mar 2026 · 17 comments
- BIG NEWS - the new Dorchester extension of the Neponset River Greenway trail is now open! Now you can bike from Tenean Beach to Morrissey Blvd drawbridge without car traffic. r/bikeboston · Jul 2025 · 26 comments
- Neponset River Greenway extension quietly opens to the public ahead of July 4 r/bikeboston · Jul 2025 · 4 comments
- Halloween bike ride pregame r/bikeboston · Oct 2025 · 5 comments
- Uncleared paths, weeks out r/bikeboston · Jan 2025 · 49 comments
- Rail Trails or Other Areas with Minimal Street Crossings? r/bikeboston · May 2026 · 37 comments
- Northern Strand Community trail - dedicated path and road crossings? r/bikeboston · Jun 2025 · 19 comments
- Cycling South Boston r/bikeboston · Mar 2026 · 5 comments
- Tips on lengthening my trip r/bikeboston · Apr 2026 · 0 comments
- Massachusetts Named Newest Member of the International Union for Conservation of Nature r/massachusetts · Apr 2026 · 44 comments
- Once the ice thawed a bit, it was perfect today r/bikecommuting · Jan 2026 · 0 comments
- Codman SQ to downtown r/bikeboston · May 2025 · 4 comments
- Short Ride in Dorchester for a Newbie r/bikeboston · Feb 2025 · 6 comments
- Uncleared paths, weeks out r/bikeboston · Jan 2025 · 9 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationNeponset River Greenway Council
- RedditSearch Reddit: r/massachusetts
Nearby trails
- Boston Harborwalk 0.4 mi away · 6.2 mi, paved
- Pierre Lallement Bike Path 2.3 mi away · 4.1 mi, paved
- South Bay Harbor Trail 2.4 mi away · 1.5 mi, paved
- Jamaicaway Bikepath 3.4 mi away · 1.5 mi, paved
- Dr. Paul Dudley White Path 3.9 mi away · 17.0 mi, paved
- East Boston Greenway 4.4 mi away · 2.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9710654, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Healey-Driscoll Administration Celebrates Opening of the Newest Section of the Neponset River Greenway — Mass.gov (DCR and MassDOT, April 29, 2026) · government source · checked Oct 13, 2026 Supports: about 9 miles through Readville, Hyde Park, Mattapan, Dorchester and Milton; DCR, MassDOT, Greenway Council and Watershed Association; Metropolitan Park System vision; official efforts from 1996; first section Pope John Paul II Park to Central Avenue completed 2002; 0.9-mile Tenean Beach to Morrissey Boulevard extension with 10-foot paved surface, Victory Road crosswalk, 670-foot boardwalk and overlook deck
- Neponset River Greenway — Neponset River Greenway Council · organization · checked Oct 13, 2026 Supports: DCR ownership of the shoreline as the Neponset River Reservation; route along Tenean Beach, Pope John Paul II Park, salt marsh and the trolley line; railroad right-of-way and soil removal; Esplanade between Truman Parkway and the river from the Martini Shell, opened 2012; Tenean Beach 2010, Port Norfolk and Readville 2015, Central Avenue to Mattapan Square 2018 with the Harvest River Bridge; planned Fowl Meadow and Columbia Point links
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.