Northern Strand Community Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Everett, Malden, Revere, Saugus and Lynn · Middlesex, Suffolk and Essex counties
Conditions now
Loading the weather near Revere…
Forecast by the National Weather Service for Revere · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Northern Strand Community Trail, also known as the Bike to the Sea Trail, is a 10-mile public-use path project, including a rail trail portion, which connects the cities of Everett, Malden, Revere, Saugus, and Lynn, along the former Saugus Branch Railroad of the Boston & Maine Railroad and other shared-use roads. The trail is part of the East Coast Greenway, a project planning to connect almost 3,000 miles of trail from Calais, Maine to Key West, Florida. The path has been planned by Bike to the Sea, a non-profit cycling advocacy group, with help from the surrounding cities.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Nahant Road mile 0.1 directions to trailhead 1
- Parking at Nahant Road mile 0.1 directions to trailhead 2
- Parking mile 0.6 directions to trailhead 3
- Parking at Washington Street mile 0.6 directions to trailhead 4
- Parking at Broad Street mile 0.8 directions to trailhead 5
- Parking at Broad Street mile 0.8 directions to trailhead 6
- Parking at State Street mile 0.9 directions to trailhead 7
- Parking at Tremont Street mile 1 directions to trailhead 8
- Parking at South Common Street mile 1.7 directions to trailhead 9
- Parking at South Common Street mile 1.7 directions to trailhead 10
- Parking at South Common Street mile 1.7 directions to trailhead 11
- Parking at Woodman Street mile 2.1 directions to trailhead 12
- Parking at Woodman Street mile 2.1 directions to trailhead 13
- Parking at Holland Avenue mile 2.1 directions to trailhead 14
- Parking at Hood Street mile 2.1 directions to trailhead 15
- Parking at Hood Street mile 2.1 directions to trailhead 16
- Parking at Hood Street mile 2.1 directions to trailhead 17
- Parking at Holland Avenue mile 2.1 directions to trailhead 18
- Parking at Hood Street mile 2.1 directions to trailhead 19
- Parking at Woodman Street mile 2.2 directions to trailhead 20
- Parking at Hood Street mile 2.2 directions to trailhead 21
- Parking at Cottage Street mile 2.2 directions to trailhead 22
- Parking at Cottage Street mile 2.2 directions to trailhead 23
- Parking at Woodman Street mile 2.3 · restrooms directions to trailhead 24
- Parking at Laurel Street mile 2.4 · restrooms directions to trailhead 25
- Parking at Summer Street mile 2.5 · restrooms directions to trailhead 26
- Parking at Summer Street mile 2.6 directions to trailhead 27
- Parking at Summer Street mile 2.6 directions to trailhead 28
- Parking at Lincoln Avenue mile 3.1 directions to trailhead 29
- Parking at Hamilton Street mile 3.2 directions to trailhead 30
- Parking at Beach Street mile 6.7 directions to trailhead 31
- Parking at Oliver Street mile 7.1 directions to trailhead 32
- Parking at Oliver Street mile 7.1 directions to trailhead 33
- Parking at Aldo's Way mile 7.8 directions to trailhead 34
- Parking at Eastern Avenue mile 7.8 directions to trailhead 35
- Parking at Eastern Avenue mile 7.8 directions to trailhead 36
- Parking at Crystal Street mile 7.8 directions to trailhead 37
- Parking at Waite Street Extension mile 7.9 directions to trailhead 38
- Parking at Crystal Street mile 7.9 directions to trailhead 39
- Parking at Eastern Avenue mile 7.9 directions to trailhead 40
- Parking at Eastern Avenue mile 8 directions to trailhead 41
- Parking at Branch Street mile 8 directions to trailhead 42
- Parking at Branch Street mile 8 directions to trailhead 43
- Parking at Eastern Avenue mile 8.1 · restrooms directions to trailhead 44
- Parking at Cross Street mile 8.2 directions to trailhead 45
- Parking at Eastern Avenue mile 8.3 · water directions to trailhead 46
- Parking at Bryant Street mile 8.4 · water directions to trailhead 47
- Parking at Bryant Street mile 8.4 · water directions to trailhead 48
- Parking at Warren Avenue mile 8.6 directions to trailhead 49
- Parking at Eastern Avenue mile 8.7 directions to trailhead 50
- Parking at Centre Street mile 8.7 directions to trailhead 51
- Parking at Centre Street mile 8.7 directions to trailhead 52
- Parking at Centre Street mile 8.9 directions to trailhead 53
- Parking at Ruing Court mile 8.9 directions to trailhead 54
- Parking at Ferry Street mile 8.9 directions to trailhead 55
- Parking at Ruing Court mile 9 directions to trailhead 56
- Parking at Charles Street mile 9.1 directions to trailhead 57
- Parking at Green Street mile 9.3 directions to trailhead 58
- Parking at Canal Street mile 9.4 directions to trailhead 59
- Parking at Green Street mile 9.4 directions to trailhead 60
- Parking at Canal Street mile 9.5 directions to trailhead 61
- Parking at Medford Street mile 9.6 directions to trailhead 62
- Parking at Medford Street mile 9.6 directions to trailhead 63
- Parking at Air Force Road mile 10.2 · restrooms · water directions to trailhead 64
(opens in a new tab) About this trail
The Northern Strand Community Trail, also called the Bike to the Sea Trail, is a shared-use path north of Boston connecting Everett, Malden, Revere, Saugus and Lynn, Massachusetts. It is about 10 miles long, including on-street links. Most of it follows the former Saugus Branch Railroad, a branch of the Boston and Maine Railroad. The cities lease the right-of-way from the MBTA for 99 years, with a clause returning it if the corridor is needed for other transportation. The path was planned by Bike to the Sea, a nonprofit cycling advocacy group, with the cities, and it is part of the East Coast Greenway.
The Everett and Malden sections opened in summer 2012 on recycled asphalt and were paved in August 2013. Iron Horse Preservation surfaced the Saugus section with gravel, and the Revere section opened in summer 2015. In February 2018 the state committed $1.5 million to design the Lynn section, and in February 2020 it awarded a $13.7 million contract to finish the Lynn portion and extend the southern end through Everett toward the Mystic River. The West Lynn section opened on November 19, 2021. In Everett, a 0.8-mile segment from Revere Beach Parkway to the Mystic River waterfront beside the Encore casino was completed in 2021.
From the trail's terminus at Western Avenue in Lynn, MassDOT project 610919 is building a 1.9-mile extension along Market Square, South Common Street, Market Street, the Lynnway and Nahant Road. It removes a travel lane for a 10-foot two-way bike lane behind a 3-foot curbed median and adds a 10-foot shared-use path. The contract, bid at $10.5 million, received its notice to proceed in February 2024, and MassDOT's project page lists it as 78 percent complete; completion was expected by November 2026. A pedestrian and bicycle bridge across the Mystic River to Draw 7 Park in Somerville's Assembly Square is expected to be built between 2026 and 2029.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 81% of this route as an abandoned rail line.
- Shade
20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boston Logan International Airport, 9 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 46 56 66 76 82 80 73 62 52 42 Low °F 23 25 31 41 50 60 66 65 58 48 38 29 Precipitation, in 3.4 3.2 4.2 3.6 3.2 3.9 3.3 3.2 3.6 4 3.7 4.3 Snow, in 14.3 14.4 9 1.6 0 0 0 0 0 0.2 0.7 9 - On the National Register
- Revere Beach Parkway--Metropolitan Park System of Greater Boston, Chelsea · historic district, listed 2007 · nomination file for Revere Beach Parkway--Metropolitan Park System of Greater Boston
- Lynn Common Historic District, Lynn · historic district, listed 1992 · nomination file for Lynn Common Historic District
- Nahant Beach Boulevard-Metropolitan Park System of Greater Boston, Lynn · historic district, listed 2003 · nomination file for Nahant Beach Boulevard-Metropolitan Park System of Greater Boston
- Munroe Street Historic District, Lynn · historic district, listed 1996 · nomination file for Munroe Street Historic District
- Common Burying Ground at Sandy Bank, Malden · site, listed 1981 · nomination file for Common Burying Ground at Sandy Bank
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston North sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
What riders say on Reddit
- Riders in 2024 and 2025 reported frequent road crossings, mostly in Malden and near Lynn, naming Broadway in Malden and Lynn Street as harder; two others in 2024 called the crossings occasional or easy. r/bikeboston, Jul 2024 · r/bikeboston, Aug 2024 · r/bikeboston, Jun 2025
- Two riders in 2024 said they parked at the Lynn Market Basket without trouble, and one rider in 2025 pointed to a free public lot on the Malden/Revere border right on the trail. r/bikeboston, Aug 2024 · r/bikeboston, Jun 2025
- Riders in 2024 and 2026 called the Lynnway stretch between the trail's Lynn end and Nahant unpleasant, and two suggested using the sidewalk there. r/Somerville, Jan 2024 · r/bikeboston, Jul 2024 · r/bikeboston, Apr 2026
- Riders in 2024 said linking the Mystic River paths to the trail included sidewalk riding over the Malden River bridge; one rider in 2025 called the Alford Street bridge over the Mystic the iffy part. r/Somerville, Jan 2024 · r/ebikes, Aug 2025
7 Reddit threads about this trail, Jan 2024 to Apr 2026
- Northern Strand Community trail - dedicated path and road crossings? r/bikeboston · Jun 2025 · 19 comments
- Northern Strand Community trail r/bikeboston · Aug 2024 · 17 comments
- Groundbreaking Ceremony to Connect Trail in Lynn to Nahant Beach Set for July 11 r/bikeboston · Jul 2024 · 10 comments
- Northern Strand Community Trail r/ebikes · Aug 2025 · 4 comments
- Revere to downtown Boston r/bikeboston · Apr 2026 · 19 comments
- Where do you go to escape Somerville? r/Somerville · Jan 2024 · 70 comments
- Rumney Marsh r/massachusetts · Oct 2025 · 28 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBike to the Sea
- Agency noticesMassDOT: Lynn–Nahant Northern Strand Extension project
- RedditSearch Reddit: r/massachusetts
Nearby trails
- Mass Central Rail Trail 1.3 mi away · 70.4 mi, paved
- Chelsea Greenway 1.7 mi away · 0.7 mi, paved
- Alewife Linear Park 1.8 mi away · 1.3 mi, paved
- Dr. Paul Dudley White Path 1.8 mi away · 17.0 mi, paved
- East Boston Greenway 2.5 mi away · 2.2 mi, paved
- Alewife Brook Greenway 3.0 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9710656, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Northern Strand Community Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7058998, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Project 610919: Lynn–Nahant–Northern Strand Extension — MassDOT Highway Division project information · government source · checked Oct 13, 2026 Supports: 1.9 miles, lane removal, 10-foot two-way separated bike lane with 3-foot curbed median, 10-foot shared-use path, bid $10,492,861, notice to proceed February 6, 2024, contract 78% complete
- Lynn/Nahant - proposed Northern Strand Extension (public meeting notice) — MassDOT Highway Division, Mass.gov · government source · checked Oct 13, 2026 Supports: extension from the Western Avenue terminus along Market Square, South Common Street, Market Street, the Lynnway and Nahant Road, about 1.9 miles
- Northern Strand Community Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: Bike to the Sea Trail name, 10-mile length, cities, Saugus Branch Railroad of the Boston and Maine, 99-year MBTA lease with reversion clause, Bike to the Sea planning, East Coast Greenway, 2012 and 2013 Everett and Malden openings and paving, Saugus gravel by Iron Horse Preservation, 2015 Revere opening, 2018 design funding, 2020 construction contract, November 19, 2021 West Lynn opening, Mystic River bridge expected 2026–2029
- The Northern Strand Trail Is Growing in Lynn and Everett — Streetsblog Massachusetts (April 7, 2023) · press · checked Oct 13, 2026 Supports: 0.8-mile Everett segment from Revere Beach Parkway to the Mystic River waterfront next to the Encore casino, completed 2021
- MassDOT Is Filling Gaps in the Border to Boston Trail — Streetsblog Massachusetts (April 29, 2025) · press · checked Oct 13, 2026 Supports: Lynn protected bikeway under construction since summer 2024, completion expected by November 2026
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
